Resolved
RESOLVED to note the content of the report and presentation.
Kent Flood Risk and Water Management Committee noted this item on Tuesday 21 March 2023. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED to note the content of the report and presentation.
The Kent Flood Risk Management Committee is asked to note the report.
1.1The Flood and Water Management Act 2010 (the Act) created Lead Local Flood Authorities (LLFAs) to oversee local flood risks, flooding from surface water, groundwater and ordinary watercourses. LLFAs were established at the upper tier level of local government. This function is performed by the Flood and Water Management team (FWM team). Schedule 3 of the Act sets out an approval and adoption mechanism for the adoption of Sustainable Drainage Systems (SuDS) by the LLFA. 1.2. However, Schedule 3 was never commenced. The government spent a lot of time preparing for it, but decided not to implement it. Instead, in 2015 Lead Local Flood Authorities (LLFA) were made statutory consultees under the National Planning Policy Framework for surface water drainage in major planning applications. This function is carried out by the Sustainable Drainage Team, within the FWM team. 1.3. Despite this there has been a lot of pressure on the government to implement Schedule 3 and in 2021 it committed to review the case for implementation. In January this year Defra announced the findings of their review, which recommended that sustainable drainage systems should be made mandatory and that the best method of ensuring this was to implement Schedule 3 of the Act.
2. The Sustainable Drainage Systems Approving Body role
2.1Following the implementation of Schedule 3, upper tier authorities, including KCC, will become the SuDS Approving Body (SAB). The SAB must approve the SuDS in accordance with the National Standards, which will be set by Defra and adopt and maintain those SuDs that serve more than one property. The following is a summary of the main duties and powers set out in Schedule 3: a. Approval: On receipt of applications for drainage approval the SAB must determine if the proposed drainage strategies meet the National standards, consult with statutory consultees, make a decision and advise the applicant on approval or refusal following this technical review. Approval must be sought from the SAB prior to construction commencing. b. Adoption: Once drainage systems have been approved the SAB will be required to undertake inspections of systems proposed for adoption, arrange for the adoption of said systems into the councils control upon completion and arrange/manage their ongoing maintenance. c. Enforcement: the SAB will have powers to stop development if they have not had approval for their drainage system prior to commencing construction. The SAB also has powers to take performance bonds from developers to fund any remedial works SuDS require prior to adoption. d. Maintenance: The SAB will be required to adopt and maintain those SuDS that serve more than one property. As SuDS systems are constructed, they will be added to a suitable asset management system and maintained to ensure that it continues to function as designed. 2.2. The approval process will be funded through application fees and the maintenance of the adopted drainage will be funded through commuted sums. These fees and charges have not yet been set.
3. Implementation of Schedule 3
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Introduction to the work of the KCC Sustainable Drainage Team and Schedule 3 of the Flood and Water Management ActReport | 3 pages | DownloadRead as text |
Follow Kent Flood Risk and Water Management Committee at Kent and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Jun 2026 | Minutes of the meeting on 04.03.26RESOLVED that the minutes of the meeting held on 4 March 2026 were an accurate record and that they be signed by the ... | Decided | Open |
| 4 Mar 2026 | Minutes of the meeting on 29.10.2025RESOLVED that the minutes of the meeting held on 29 October 2025 were an accurate record and that they be signed by t... | Decided | Open |
| 4 Mar 2026 | KCC Severe Weather Response Activity ReportRESOLVED to note the verbal update on | Noted | Open |
| 4 Mar 2026 | Met Office- Introduction PresentationRESOLVED to note the Met Office Presentation | Noted | Open |
| 4 Mar 2026 | SGN - Introduction and Water Ingress into the Gas Network PresentationRESOLVED to note the Southern Gas Network (SGN) presentation | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.