Resolved
RESOLVED that the minutes of the meeting held on 14 March 2024 were an accurate record and that they be signed by the Chair.
Kent Flood Risk and Water Management Committee decided this item on Tuesday 16 July 2024. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that the minutes of the meeting held on 14 March 2024 were an accurate record and that they be signed by the Chair.
KENT COUNTY COUNCIL
KENT FLOOD RISK AND WATER MANAGEMENT COMMITTEE
MINUTES of a meeting of the Kent Flood Risk and Water Management Committee held in the Council Chamber, Sessions House, County Hall, Maidstone on Thursday, 14 March 2024.
PRESENT: [name removed] (Chairman), [name removed], [name removed], [name removed] and [name removed]: Cllr Mrs J Blandford, [name removed], [name removed], Cllr P Garten and [name removed].
IN ATTENDANCE: [name removed] (Flood and Water Manager), [name removed] (Resilience and Emergency Planning Manager) and [name removed] (Democratic Services Officer)
UNRESTRICTED ITEMS
45. Declarations of Interest (Item 4)
No declarations were made.
46. Minutes of the meeting held on 14 November 2023 (Item 5)
RESOLVED that the minutes of the meeting held on 14 November 2023 were an accurate record and that they be signed by the Chairman.
47. Terms of Reference (Item 6)
RESOLVED to note the Committee’s updated Terms of Reference, as approved by County Council on 16 November 2023.
48. Southern Water - Clean Rivers and Seas Taskforce - Presentation (Item 7)
Jon Yates (Pathfinder Delivery Lead) was in attendance for this item.
1. [name removed] gave a presentation. The contents of his presentation included:
a. The Ofwat Accelerated Infrastructure Delivery Project;
1 b. The Clean Rivers and Seas Taskforce Accelerated Plan, which included £9m of investment in Kent targeting five overflows, delivering 1 treatment works optimised, 2 pumping station optimisations, 8 surface water misconnection redirected, 2,000 household downpipes fitted with slow the flow measures and 10 roadside sustainable drainage schemes installed. It was stated that these measures would lead to a minimum 20% reduction in spills by April 2025;
c. Optimisation at the Swalecliffe Treatment Works, which had achieve a 20% reduction in long sea outfall events;
d. Centaur Gates and the development of a programme of works to make Whitstable the first Intelligent Catchment, utilising forecast rainfall, real time network information and AI to manage the infrastructure in a different efficient way to reduce CSO usage across the catchment and 37 pumping stations;
e. Completed surface water connection works in Whitstable and Deal;
f. Planned sustainable drainage system schemes in Whitstable, Deal and Margate;
g. Slow the Flow and installation of water butts and planters in Whistable, with a future focus on targeting large industrial roof spaces;
h. Clean Rivers and Seas Regional Plan. It was confirmed that over 1,000 overflows would be investigated in the region between 2025-30 and that the Plan’s budget had increased from £750m to £1bn;
i. Members were invited to use the interactive Clean Rivers and Seas Regional Plan map, which included details on when works were planned, how much had been invested and their expected impact at www.southernwater.co.uk/water-for-life/clean-rivers-and-seas- plan/map; and
j. Confirmation that a new Beachbuoy app would be released later in Spring 2024.
2. A Member commended Southern Water on its recent response during water outages in Thanet.
3. Following a comment from a Member, [name removed] stated that whilst Southern Water were not a statutory consultee on major planning applications, they were on local plans and worked hard with local planning authorities to be part of the conversation on planned development.
4. A Member asked to what extent major residential developments contributed to greater levels of surface water flooding. [name removed] stated that new major developments had not significantly worsened flooding and that smaller developments contributed to a larger extent as a results of surface water run off connections into foul. He confirmed that Southern Water had worked with designers and developers to ensure that sustainable drainage systems were
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Minutes of the meeting on 14 March 2024Minutes | 6 pages | DownloadRead as text |
Follow Kent Flood Risk and Water Management Committee at Kent and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Jun 2026 | Minutes of the meeting on 04.03.26RESOLVED that the minutes of the meeting held on 4 March 2026 were an accurate record and that they be signed by the ... | Decided | Open |
| 4 Mar 2026 | Minutes of the meeting on 29.10.2025RESOLVED that the minutes of the meeting held on 29 October 2025 were an accurate record and that they be signed by t... | Decided | Open |
| 4 Mar 2026 | KCC Severe Weather Response Activity ReportRESOLVED to note the verbal update on | Noted | Open |
| 4 Mar 2026 | Met Office- Introduction PresentationRESOLVED to note the Met Office Presentation | Noted | Open |
| 4 Mar 2026 | SGN - Introduction and Water Ingress into the Gas Network PresentationRESOLVED to note the Southern Gas Network (SGN) presentation | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.