CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Borough Council of King's Lynn and West Norfolk
Local Plan Task Group, Wednesday 4 September 2019 at 11.15am

Strategic approach to climate change - suggested policy justification

Agreed Committee 2 papers

Local Plan Task Group agreed this item on Wednesday 4 September 2019. Below is the council's own wording, with the papers it was decided on.

Item10

Resolved

AGREED: 1) The Planning Policy Team to research the strategic approach to sustainability and climate change including Warwick District Council. 2) Revised draft climate change policy to be presented to a future Task Group meeting.
Word for word from the decision King's Lynn and West Norfolk published for this meeting. Source: democracy.west-norfolk.gov.uk

Follow this further

Built from King's Lynn and West Norfolk's papers

What the report saysPro

Report to Local Plan Task Group

Policy LP* – Climate Change Policy Introduction 1.1 Climate change has been at the forefront of international concerns in recent years. Climate change refers to the systematic change in weather patterns and average temperatures on a large and long term scale (Met Office: 2019). These have mainly changed due to anthropogenic emissions (i.e. arising from human activity) since pre-industrial times (1850’s). The scientific data which has been published has shown that the impacts of climate change can be alarming if stabilisation is not achieved. In the UK we are facing warmer temperatures and a wetter climate; the changing temperatures saw the hottest day ever recorded in the UK in July 2019 with a temperature of 38.7C (Met Office: 2019). The seven wettest years on record in the UK have also occurred since 1998, the top two being in 2014 and 2016 (The National Adaptation Programme: 2018).

1.2Anthropogenic emissions are estimated to have caused around 1C of global warming since pre-industrial levels, and could increase a further 1.5C between 2030 and 2052 if it continues to increase at the current rate (IPCC Special Report: Global Warming of 1.5 Celsius: 2018). The IPCC report estimates different data sets which could happen if global warming increased to 1.5C instead of 2C. It breaks down environmental, economic and social factors which can be affected by this change including: health risks, economic growth and water scarcity.

1.3The IPCC and the Paris Agreement (2015) aim to strengthen the response of global stakeholders in dealing with climate change and wants to encourage limiting the increase in global temperature to 1.5C rather than 2C to realistically avoid the worst extremes this change could bring. By encouraging a global participatory approach at local, regional and national levels, stakeholders can bring positive attempts to reduce the local risks we may face by improving mitigation strategies which are required to limit our carbon footprint.

1.4The Climate Change Act (2008) amended the UK legislation in June 2019 to become carbon neutral by the year 2050. This is expected to be achieved by reducing the greenhouse gas emissions already present in our atmosphere by 100% (previously 80%) from the 1990 baseline levels to 2050. This national reduction

1 trajectory shows how serious the issue has become and requires all stakeholders, including the borough council, to fully engage and understand the importance of climate change and how we will alleviate and adjust to the changes which are already apparent.

1.5The NPPF emphasises the important role the planning system must take in supporting the movement towards a low carbon economy. Plans must respond in an appropriate manner, with reference to their local environment, putting mitigation and adaptation measures in place to cope with the risks of coastal change, flood risk and rising temperatures. One example of change has been shown in the Flood risk assessments: climate change allowances guidance (Environment Agency: 2019), whereby the Environment Agency expects that sea level rise will increase the rate of coastal erosion. For the East of England the cumulative rise from 1990 to 2115 is expected to be 1.21m; just one issue that we must acknowledge for future development in West Norfolk. This is built into the strategic flood risk assessment which supports the Local Plan Review.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Climate changeReport 170 KB DownloadRead as text
PDF
Strategic approach to climate change: suggested policy justificationReport 69 KB Download

At this meeting

Whole meeting

Who was there

14 of 16 attended
RB
Councillor Richard BluntCommittee Member, apologies
FB
Councillor Francis BoneCommittee Member, present
AB
Councillor Anthony BubbCommittee Member, present
CC
Councillor Chris CroftsCommittee Member, present
MD
Councillor Michael de WhalleyCommittee Member, present
ID
Councillor Ian DevereuxPortfolio Holder, present
AF
Alex FradleyOfficer, absent
AG
Alan GommOfficer, present
CJ
Councillor Charles JoyceCommittee Member, present
AK
Councillor Alexandra KempCommittee Member, present
JM
Councillor Jim MoriartyCommittee Member, present
TP
Councillor Terry ParishCommittee Member, present

All 16 on the meeting page

More from King's Lynn and West Norfolk Local Plan Task Group

All decisions
MeetingDecisionOutcome
21 Apr 2026 Local Plan Task Group Terms of Reference (Report to Cabinet)That the Local Plan Task Group supported the draft Cabinet report and proposed changes to its Terms of Reference. Decided Open
21 Apr 2026 Draft Local Plan Vision & 10 Measurable Outcomes (presentation)RESOLVED :That the report be noted. Noted Open
10 Feb 2026 Introduction to and demonstration of the Interactive Version of the Local Plan - Henry.AGREED: (1) That parish boundaries be added as a selectable layer to the existing interactive map before the next mee... Agreed Open
10 Feb 2026 Draft National Planning Policy Framework (NPPF) consultation response discussion - Sandra.AGREED: (1) That comments be collected from Members via email for inclusion in the Council’s response to the draft NP... Agreed Open
12 Sep 2024 Notes of the Previous MeetingThe notes of the meeting held on 14 May 2024 were agreed as a correct record. Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies