Resolved
The update was noted. 2. The comments made by the Panel be considered. 3. The final version of the Plan to be considered by the Panel once ready.
Regeneration and Development Panel noted this item on Tuesday 8 June 2021. Below is the council's own wording, with the papers it was decided on.
Resolved
The update was noted. 2. The comments made by the Panel be considered. 3. The final version of the Plan to be considered by the Panel once ready.
King’s Lynn Local Cycling and Walking Infrastructure Plan Update R&D Panel 08/06/21 Project Overview Background - Why produce an LCWIP?
The Borough and County Councils adopted the King’s Lynn Transport Strategy and Implementation Plan in spring 2020 This strategy recognises the existing relatively high level of walking and cycling in King’s Lynn and the favourable terrain The Implementation Plan contained a small number of schemes to address known issues and encourage further walking and cycling It also recognised that a full appraisal of the cycling and walking network was required to devise a comprehensive plan for the town Having a DfT approved LCWIP will put the town in a good position to attract government funding for walking and cycling schemes In view of this the Borough and County Councils agreed to jointly fund the preparation of an LCWIP in autumn 2020 Key Outputs of an LCWIP
The LCWIP will provide the following key outputs:
A network plan for walking and cycling and identification of the priority cycling routes and walking zones A prioritised programme of infrastructure improvements to be delivered in the short, medium and long term A report which sets out the underlying analysis carried out and provides a narrative which supports the iden fied improvements and growing network.
The LCWIP aligns with the recent Gear Change report and the Cycle Infrastructure Design Guidance, as well as the King’s Lynn Transport Strategy, the Public Realm Action Plan and the Towns Fund. Stages of an LCWIP
Stage Title Details How this was completed in King’s Lynn
1 Determining Scope Establish the geographical extent of the LCWIP, and arrangements Established though meetings with NCC and for governing and preparing the plan. BCKL&WN to identify a focus study area and a wider connectivity study area so the Urban area of King’s Lynn and surrounding villages are connected (see figure 3)
2 Gathering Information Identify existing patterns of walking and cycling and potential new Existing information gathered from a wide range of journeys. Review existing conditions and identify barriers to cycling sources including Census Data, Strava data, existing and walking. Review related transport and land use policies and traffic count data and existing strategic documents. programmes.
3 Network Planning for Cycling Identify origin and destination points and cycle flows. Convert flows Network planning reviewing key attractors and into a network of routes and determine the type of improvements following feedback from workshops and KL vision required. active travel survey.
4 Network Planning for Walking Identify key trip generators, core walking zones and routes, audit Network planning reviewing key attractors and existing provision and determine the type of improvements following feedback from workshops and KL vision required. active travel survey.
5 Prioritising Improvements Prioritise improvements to develop a phased programme for future In progress investment. 6 Integration and Application Integrate outputs into local planning and transport policies, In progress strategies, and delivery plans. Study Areas of the LCWIP Overview of Town Centre network Clenchwarton (orange): Town Centre to Clenchwarton
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Local Cycling and Walking Infrastructure PlanReport | 2.5 MB | DownloadRead as text |
Follow Regeneration and Development Panel at King's Lynn and West Norfolk and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 30 Sep 2026 | RD26The minutes from the previous meeting were agreed as a correct record and signed by the Chair. | Agreed | Open |
| 30 Sep 2026 | RD32The Panel’s Work Programme and the Forward Decisions List were noted. | Noted | Open |
| 30 Sep 2026 | RD34That under Section 100(A)(4) of the Local Government Act, 1972, the press and public be excluded from the meeting for... | Decided | Open |
| 30 Sep 2026 | RD35That the Regeneration and Development Panel support the recommendations to Cabinet as included in the agenda. | Decided | Open |
| 22 Jul 2026 | RD14The minutes from the previous meeting were agreed as a correct record and signed by the Chair. | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.