Noted Committee 1 paper

AI summaryKing's Lynn and West Norfolk councillors noted a presentation on the Hunstanton Masterplan, with 240 residents attending consultation events and strongest public support for Oasis leisure site redevelopment.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeNotedNo approval or rejection of the masterplan
MoneyNot stated
What happens nextFinal draft masterplanFurther consultation then Cabinet 9th June 2026
Who it affectsHunstanton residents and businessesPlus visitors, elderly and disabled users

What was decided

The Panel noted the presentation on the Hunstanton Masterplan, taking on board the consultation findings without approving or rejecting any specific proposals. Report P1, P89

Why

Public consultation ran from 12th January to 6th February 2026, with over 240 attendees at two drop-in events, 109 questionnaire responses and 1251 webpage views. Report P3, P4, P5, P6, P7

Views were mixed, with the strongest support for a new multi-use leisure complex at the Oasis site, where 70% agreed with the proposal. Report P83, P87

Respect for the environment and natural assets scored highest among the 20 issues tested, with 96% rating it very important or important, while concerns centred on loss of parking, pedestrianisation of the High Street, and overdevelopment. Report P44, P45, P88

What happens next

Officers will develop a final draft masterplan that addresses issues raised in consultation, including car parking, accessibility and pedestrianisation, as design or policy matters that may need further study. Report P88

A further public consultation on the final draft is planned for 14th January to April 2026, subject to the pre-election period, alongside a BCKLWN officer briefing in March. Report P90, P91

The matter returns to the Regeneration and Development Panel on 2nd June and to Cabinet on 9th June 2026. Report P92

Options considered

  • Chosen: Note the presentation and the consultation findings. The Panel's formal decision was to note the presentation; no alternative options were put to a vote. Report P1

Implications

  • Risk: Consultation showed low public confidence in delivery due to past unimplemented plans, with strong calls to fix existing assets such as the promenade, beach and sea defences before adding new development. Report P84
  • Other: The final draft must balance tourism, resident needs, parking, accessibility and the Victorian seaside character, with strong opposition to more flats, chain hotels and pedestrianisation of the High Street. Report P48, P52, P56, P60
  • Equalities: Elderly and disabled residents raised concerns about loss of close parking, pedestrianisation and the need for accessible beach access, including beach wheelchairs and floating pontoons. Report P28, P31, P48, P56, P60
  • Climate: The Wash barrier was raised as a concern, with residents warning it could affect long-term visitor numbers; environmental protection around The Wash wildlife was also flagged. Report P31, P72

Who and where

  • Hunstanton residents, who made up 71% of questionnaire respondents Report P8
  • High Street businesses, concerned about pedestrianisation and loss of parking Report P48, P60
  • Elderly and disabled residents, reliant on close central parking Report P48, P56, P66
  • Visitors and the tourism economy, including caravan owners Report P52, P66, P84
  • Existing seafront attractions such as the crazy golf, Princess Theatre and Oasis Report P78, P38
  • Young people and families, with calls for youth facilities and all-weather activities Report P27, P28

Timeline

  • 15th January and 2nd February 2026: Drop-in events at Hunstanton Town Hall Report P4
  • 12th January, 6th February 2026: Public consultation period on the draft masterplan Report P3
  • March 2026: BCKLWN officer briefing Report P90
  • 2nd March 2026: Regeneration and Development Panel update Report P89
  • 14th January to April 2026 (subject to pre-election period): Public consultation on the final draft masterplan, as written in the report Report P91
  • 2nd June 2026: Regeneration and Development Panel meeting Report P92
  • 9th June 2026: Cabinet meeting Report P92

Plain English for the jargon

  • Masterplan: A long-term planning document setting out how an area should be developed and improved.
  • Oasis: Hunstanton's leisure centre site, identified in the masterplan for major redevelopment as a new multi-use leisure complex.
  • LCWIP: Norfolk County Council's Countywide Local Cycling and Walking Infrastructure Plan, proposed to be integrated into the masterplan.
  • Wash barrier: A proposed tidal barrier scheme in The Wash, flagged by residents as a concern for long-term visitor numbers.
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
ItemRD83:

Resolved

The Panel noted the presentation on the Hunstanton Masterplan.
Word for word from the decision King's Lynn and West Norfolk published for this meeting. Source: democracy.west-norfolk.gov.uk

Follow this further

Built from King's Lynn and West Norfolk's papers

What the report saysPro

Report to Regeneration and Development Panel

Hunstanton Masterplan Regeneration and Development Panel 2nd March 2026

Jemma Curits, Regeneration Programmes Manager Connor Smalls, Regeneration Programmes Officer Summary of Public Consultation

• Consultation Period 12th January – 6th February 2026

• 2 Drop-in events at Hunstanton Town Hall: 15th January and 2nd February.

• Over 240 attendees to the two public drop in sessions

• 109 responses to questionnaire both online and physical copies

• 1251 views for the Hunstanton Masterplan Webpage between 12th January – 6th February 2026

• 71% of responders were residents of the Borough with business, community groups, landowners and investors, Councillors and Council Officer also completing the survey. Summary of Public Consultation - How important are these issues? 1. Attracting more visitors to the town for a longer period of the year extending into winter.

• Very Important/Important: 79% Not so Important/Not At All Important: 21%

2. The creation of new high quality public spaces

• Very Important/Important:74% Not so Important/Not At All Important: 26%

3. The improvement of public transport links.

• Very Important/Important: 89% Not so Important/Not At All Important: 11% Summary of Public Consultation - How important are these issues? 4. The improvement of walking and cycling links

• Very Important/Important: 65% Not so Important/Not At All Important: 35%

5. Better management of cars, and prioritising of pedestrians and cyclists

• Very Important/Important: 58% Not so Important/Not At All Important: 42%

6. The creation of better links between the seafront and promenade, and the town centre

• Very Important/Important: 57% Not so Important/Not At All Important: 43% Summary of Public Consultation - How important are these issues? 7. The improvement of the seafront and promenade to create a more attractive seaside destination

• Very Important/Important: 83% Not so Important/Not At All Important: 17%

8. The creation of better more usable and beautiful spaces on the promenade and seafront for people to feel good and enjoy using, and to stay and linger and enjoy the views out of the sea

• Very Important/Important: 78% Not so Important/Not At All Important: 22%

9. The provision of more shelter on the seafront to make it more useable for a longer period in the year.

• Very Important/Important: 61% Not so Important/Not At All Important: 39% Summary of Public Consultation - How important are these issues? 10. The opportunity for new and enhanced leisure at the wider Oasis site area, including potential uses such as a new cinema, sports facilities, bars and restaurants, snooker, darts and other leisure facilities

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Hunstanton Masterplan and Parking Strategy UpdateReport 3.9 MB DownloadRead as text

At this meeting

Whole meeting

Who was there

11 of 13 attended
BA
Councillor Bal AnotaCommittee Member, apologies, sent representative
PB
Councillor Paul BlandCommittee Member, present
RB
Councillor Richard BluntCommittee Member, present
FB
Councillor Francis BoneCommittee Member, present
AB
Councillor Anthony BubbCommittee Member, present
MJ
Councillor Mrs Judith CollinghamCommittee Member, absent
RC
Councillor Robert ColwellCommittee Member, present
CC
Councillor Chris CroftsCommittee Member, present
JC
Jemma CurtisOfficer, present
PH
Councillor Peter HodsonCommittee Member, present
JO
Councillor Joshua OsborneVice-Chair, present
TP
Councillor Terry ParishChair, present

All 13 on the meeting page

More from King's Lynn and West Norfolk Regeneration and Development Panel

All decisions
MeetingDecisionOutcome
30 Sep 2026 RD26The minutes from the previous meeting were agreed as a correct record and signed by the Chair. Agreed Open
30 Sep 2026 RD32The Panel’s Work Programme and the Forward Decisions List were noted. Noted Open
30 Sep 2026 RD34That under Section 100(A)(4) of the Local Government Act, 1972, the press and public be excluded from the meeting for... Decided Open
30 Sep 2026 RD35That the Regeneration and Development Panel support the recommendations to Cabinet as included in the agenda. Decided Open
22 Jul 2026 RD14The minutes from the previous meeting were agreed as a correct record and signed by the Chair. Agreed Open