INFORMATION SECTION
1. REVIEW OF STREET LIGHTING IN THE NEIGHBOURHOOD 2. HIGHWAY PLANNED MAINTENANCE – 2008/09 PROGRAMME 3. STATION ESTATE AND THE SURROUNDING ROADS 4. REVIEW OF NEIGHBOURHOOD PARKING SCHEMES 5. MALDEN WAY SAFETY BARRIER – TRANSPORT FOR LONDON REPORT 6. LIVERPOOL ROAD AND QUEENS ROAD PETITIONS 7. HOGSMILL SEWAGE TREATMENT WORKS 8. ALTERNATIVES TO FREE STANDING ADVERTISING BOARDS 9. POTENTIAL FORTHCOMING BUSINESS 10. TRAFFIC SCHEMES UPDATE …………………………………………………… H2
1. REVIEW OF STREET LIGHTING IN THE NEIGHBOURHOOD
1. In 2006 the Council approved a six year street lighting improvement programme. This was divided into replacing the remaining concrete lighting columns beyond their design life and replacing the existing lanterns on steel lighting columns that had over fifteen years design life remaining.
2. The lantern conversion programme was required to replace existing lanterns which were beyond their useful life. The opportunity is being taken to provide new lanterns which use less energy, thus reducing the CO2 energy footprint. The light output is ‘white light’ which can be directed where it is required providing an increased feel safe factor and reduced intrusive light pollution.
3. In this Neighbourhood the lantern conversion programme was commenced this year (2007/08), completing 27 roads and the footpath that runs from Coombe Hill Road to the A3. 272 lanterns in total were replaced in the roads listed in ANNEX 1.
4. Members received complaints following the lantern conversions in Ullswater Crescent and Robin Hood Lane. Photographs in Members’ Additional Material Pack (and in libraries and on the website www.kingston.gov.uk/committeeminutes) show the original low pressure Sox lighting in Ullswater Crescent and a typical example of the new Cosmo white light standard which we are trying to achieve.
5. An investigation has been undertaken, including a night time inspection, and the results have confirmed that the lighting uniformity in both Ullswater Crescent and Robin Hood Lane are below expectation. The reason for this is that the road and footpaths widths combined with the existing spacings between lighting columns are too great for the new lanterns to provide the correct level of uniformity. The result creates a patchy high/low light.
6. The options would be to: a. reinstate the original low pressure sodium Sox lanterns as requested by the residents - estimated cost £1482. b. install a completely new lighting scheme Cosmo lanterns on six metre high lighting columns – estimated cost £69,000. c. install quality high pressure sodium Son lanterns on the existing lighting columns. These lanterns are salvaged from the ongoing replacement programme – estimated cost £1482.
7. It is intended to remove the new Cosmo lanterns and replace them with suitable high pressure Son lanterns with sufficient remaining life in Ullswater Crescent and Robin Hood Lane only. It is intended to start these works in March 2008.
8. The lighting output will be better than the original Sox lighting, giving increased uniformity and colour recognition. Use of high pressure Son lanterns will, however, will increase the energy usage from the Cosmo 45watts to 70watts.
9. It is anticipated that the costs would be for the lantern replacement work only. The total number of lanterns to be replaced is 39 at a cost of £38 each (total £1482) and this will be met from the Street Light Improvement Plan budget.
Background papers – held by the author of the report, Paul Stack, Public Lighting and Signs Manager, tel: 020 8547 5975, e-mail: [email protected] H4
2. HIGHWAY PLANNED MAINTENANCE – 2008/09 PROGRAMME
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
HxInfoSectionStreet lightingAnnex2Appendix | 845 KB | Download |
PDF |
HxInfoSectionStreet lightingAnnex2bAppendix | 847 KB | Download |
PDF |
HxInfoSectionStreet lightingannexAppendix | 42 KB | Download |
PDF |
INFORMATION SECTIONReport | 132 KB | DownloadRead as text |
Follow Maldens and Coombe Neighbourhood at Kingston upon Thames and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 17 Mar 2022 | Community GrantsResolved that – 1. that the application from the Zoological Society of London - Kingston HogWatch, for the sum of £3,... | Approved | Open |
| 17 Mar 2022 | Objection to traffic management order for the introduction of disabled bay on Gooding CloseResolved that – 1. the comments and objections received, summarised in paragraphs 4 and 5, and officer comments in pa... | Noted | Open |
| 17 Mar 2022 | Coombe Estate Highway Maintenance Estimates 22_23Resolved that the maintenance estimates for the Coombe Estate Roads, as set out in the Annex 1 to the agenda report, ... | Approved | Open |
| 22 Sep 2021 | Neighbourhood GrantsRESOLVED that the - Allocation of £2,916 of Neighbourhood Community Grant funding To Voices of Hope ( VoH ), a Kingst... | Decided | Open |
| 24 Jun 2021 | Appointment of the Chair and Vice-ChairRESOLVED that Councillor Simon Edwards be appointed Chair and Councillor Lesley Heap be appointed Vice-Chair for the ... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.