RESOLVED that 1. approval be given, in principle, to the introduction of a new Hogsmill Cycle Bridge over the River Hogsmill and the provision of new cycle tracks between Sheephouse Way and Knollmead (which will be subject to the required consents and funding being secured); 2. the process for receiving future reports(as set out in paragraph 11 of the report) for the Committee to consider further stages of this scheme as it progresses, be agreed. 3. the Executive be advised of the Committees’ support for the scheme in a report seeking Executive approval for the widening of the paths across the Hogsmill Open Space and for their designation as highway (which would also be subject to Government Office for London (GOL) consents); Reason for decision To improve the existing cycle route network in the Borough and improve access for cyclists and pedestrians between Malden Manor Railway Station, local schools and surrounding residential areas.
Word for word from the decision Kingston upon Thames published for this meeting.Source: moderngov.kingston.gov.uk
As reported to the Maldens and Coombe and Surbiton Neighbourhood Committees in September 2007, a design study has been carried out for the introduction of a new cycle bridge, alongside the existing pedestrian bridge, over the River Hogsmill, to serve the cycle route between Sheephouse Way (Malden Manor) and Knollmead (Tolworth).
As this cycle route runs in both Neighbourhoods and the Neighbourhood boundary runs along the middle of the River Hogsmill, the approval of both Neighbourhood Committees is required to progress this scheme. The approval of the Executive is required to apply to the Government Office for London for legal consent to the widening of the existing paths across the Hogsmill Open Space.
The proposals for a new cycle bridge and new cycle tracks linking the bridge with the highway network (attached at ANNEX 1) are submitted for in-principle approval at this stage, so that further investigation can be undertaken on the legal consents required and on the funding (ref. para. 10). A further report on these aspects, and to seek a Traffic Management Order for the route, would be submitted to both Committees, before seeking final approval of the scheme.
Recommendations
It is RECOMMENDED that
1. approval be given, in principle, to the introduction of a new Hogsmill Cycle Bridge over the River Hogsmill and the provision of new cycle tracks between Sheephouse Way and Knollmead (which will be subject to the required consents and funding being secured);
2. the process (ref. para. 11 of the report) for receiving future reports, to consider further stages of this scheme as it progresses, be agreed.
3. the Executive be advised of the Committees’ support for the scheme in a report seeking Executive approval for the widening of the paths across the Hogsmill Open Space and for their designation as highway (which would also be subject to Government Office for London (GOL) consents);
Reason for recommendations
To improve the existing cycle route network in the Borough and improve access for cyclists and pedestrians between Malden Manor Railway Station, local schools and surrounding residential areas. H2
Background
1. There is an ongoing programme to improve London Cycle Network (LCN)/ Cycling on Greenways (CoG)/Wimbledon Greenways routes in the Borough. The Wimbledon Greenways will provide several high quality cycle and pedestrian routes serving the Olympic 2012 AELTC Wimbledon Tennis venue. The routes will also form a network of primarily “off road” recreational routes in south west London through Richmond Park, Wimbledon Common and along the Thames riverside that will connect with existing cycle routes.
2. A feasibility and outline design study was undertaken in 2007/8 for a new cycle bridge over the River Hogsmill alongside the existing pedestrian bridge between Knollmead and Sheephouse Way.
3. The route between Knollmead (Tolworth) and Sheephouse Way (Malden Manor) is shown on the RBK ‘Cycling in Kingston’ map as forming part of the London Cycle Network. However, cycling is not permitted along it, as the existing pedestrian bridge and approach routes are narrow, and it remains a ‘cycle dismount’ section.
4. The route has the potential to provide a direct link between Tolworth and Malden Manor, avoiding a lengthy detour via busy roads for both cyclists and pedestrians. The existing route is well used, particularly by school children attending Richard Challoner Boys School in Manor Drive, and improvements have been identified in the approved School Travel Plan.
5. A similar improvement scheme was successfully introduced in 2003 at the Surbiton Hill Park/Green Lane crossing point of the Hogsmill River, approximately one kilometre north of this site.
PROPOSAL
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Maldens and Coombe Neighbourhood at Kingston upon Thames and we tell you when its next papers are published, before the meeting rather than after it.
Appointment of the Chair and Vice-ChairRESOLVED that Councillor Simon Edwards be appointed Chair and Councillor Lesley Heap be appointed Vice-Chair for the ...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.