RESOLVED that 1. that the following measure be approved on South Lane, South of the A3: the existing guard railing be removed on the exit of the subway, and vibraline road markings be introduced along the edge of the existing advisory cycle lane, up to the existing traffic calming table (as set out in Annex 2 of the report - option two, drawing no. 067802 ). 2. Authority be delegated to the Service Director (Planning and Transportation) to carry out formal consultation on the above proposal, in consultation with the Chair of the Neighbourhood Committee and Ward Councillors, and - subject to no significant objections being received – to implement the scheme. Reason for the decision To improve access/egress to the A3 subway, improve the safety of cyclists at this location, encourage cycling journeys and to support the key principles of the LCN+ policies.
Word for word from the decision Kingston upon Thames published for this meeting.Source: moderngov.kingston.gov.uk
The northern access to the A3 subway on South Lane (north of the A3) is often obstructed by parked vehicles, which restricts cyclists’ line of sight. A Cycle Route Implementation and Stakeholder Plan (CRISP) study also identified that the southern entrance to the A3 subway (south of the A3) needs to be improved in order to support the London Cycle Network (LCN) + key principles. LCN+ funding for 2009/2010 has been allocated to progress detailed design and implementation to improve cycling safety.
Recommendations
It is RECOMMENDED that
1. that one of the following measures be approved on South Lane, South of the A3: a) either convert the existing informal dirt track on the eastern grass verge into a paved cycle track, to connect with the existing South Lane southbound advisory cycle lane (option one, Drawing No. 067801); or b) or remove the existing guard railing on the exit of the subway, and implement vibraline road markings along the edge of the existing advisory cycle lane, up to the existing traffic calming table (option two, Drawing no. 067802).
2. Authority be delegated to the Service Director (Planning and Transportation) to carry out formal consultation on the above proposal, in consultation with the Chair of the Neighbourhood Committee and Ward Councillors, and - subject to no significant objections being received – to implement the scheme.
Reason for recommendations
To improve access/egress to the A3 subway, improve the safety of cyclists at this location, encourage cycling journeys and to support the key principles of the LCN+ policies.
Background
1. The Committee received a report at its meeting in February about obstruction by parked vehicles and restrictions to cyclists’ line of sight at the northern access to the A3 subway on South Lane (north of the A3) which was a safety risk. South Lane forms an important part of the LCN+ Link 122, used by many cyclists travelling between Worcester Park and Kingston. A Cycle Route Implementation and Stakeholder Plan (CRISP) study had indicated that the southern entrance to the A3 subway (south of the A3) needs to be improved in order to support the London Cycle Network+ (LCN+) key principles. LCN+ funding for 2008/09 was allocated to allow a scheme to be progressed, incorporating various measures including parking restrictions to address these cycling safety problems. 2. The Committee at that meeting approved a scheme at South Lane, north of the A3 to introduce ‘at any time’ waiting restrictions on both sides of South Lane in front of the A3 subway entrance, northwards for a distance of approximately 25m. The Committee delegated authority to the Service Director (Planning and Transportation) to carry out formal consultation on the proposed measures, in consultation with the Chair of the Neighbourhood Committee and Ward Councillors, and - subject to no significant objections being received – to implement the scheme.
3. On the south side of the A3, guard railing prevents cyclists joining South Lane immediately out of the subway. The desire line for cyclists is therefore across the grass verge outside No. 240 South Lane. Overtime, this has created a visible and worn dirt track. As part of the TfL A3 CRISP Study, it was identified that other improvements could be made to the cycle route south of the A3. Various measures for this location were agreed at the February meeting; however, these proposals fall within Traffic for London Road Network (TLRN), for which TfL are the highway authority. A copy of the proposed TfL improvements for that location are attached in ANNEX 1.
4. In addition, Officers were asked to monitor any displacement of parking from the A3 subway entrance to nearby residential areas and it was confirmed that a road safety audit and cycle survey for the proposed scheme design would be undertaken before implementation.
PROPOSAL
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Maldens and Coombe Neighbourhood at Kingston upon Thames and we tell you when its next papers are published, before the meeting rather than after it.
Appointment of the Chair and Vice-ChairRESOLVED that Councillor Simon Edwards be appointed Chair and Councillor Lesley Heap be appointed Vice-Chair for the ...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.