Resolved
RESOLVED that the following applications are permitted or refused as indicated.
Surbiton Planning Sub-Committee refused this item on Wednesday 22 January 2014. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that the following applications are permitted or refused as indicated.
Neighbour Notification - 62 additional letters of objection and 4 letters of support has been received.
1. Concerns raised within the objections include: a. The application results in a gross overdevelopment of the site. b. There is no need for a Tesco in this location given the New Malden store and other Tesco stores (mainly Tesco Locals) nearby. c. Store would be detrimental to shops and retail provision on Tolworth Broadway resulting in increased vacancy rates. d. Large out of town retail supermarkets are experiencing falls in their trade given the development of online shopping so this store is not required. e. The development would increase congestion in the local highway network which is already extremely busy. This relates not only to the A3, A240 and Tolworth roundabout but many surrounding residential roads as well. f. Additional traffic would be detrimental to highway safety. g. There is a lack of local of infrastructure to support the development. i.e. school places, doctors surgeries etc. h. Air pollution from the increase in traffic. i. Noise pollution from the increase in traffic and activity. j. Lack of car parking for residential development. k. Lack of parking for the retail store. l. There is no need for another hotel. m. The existing ‘sense of community’ would be eroded with a new superstore on the site. n. Development would not provide for a sense of community itself. o. The proposed pedestrian link from Hook Rise North to Hook Rise South is undesirable. p. The proposed residential development is out of keeping with the character of the area in terms of scale. 2. The letter of support makes the following comments: a. This part of Tolworth has become run down and derelict. A Tesco superstore would offer: i. many new jobs for the borough ii. re-generation as this area of the borough has become run down and uninviting. This scheme would bring the area back to life. iii. flats that are badly needed along with affordable housing. iv. The proposed crossing to allow access from Hook Rise North to Hook Rise South will be an improvement for the connectivity of the area. v. The Tesco application would help ease traffic congestion
South of the Borough Neighbourhood Committee - Resolved that the following points made at the meeting be referred to the Development Control Committee to consider when determining the application:
1. There are a significant number of concerns and objections raised in the report including: from TfL (in relation to impact on traffic flow, network capacity and congestion), Neighbourhood Traffic Engineers (including safety concerns), Climate Change & Sustainability officer, Environmental Health officer (noise and air pollution), the GLA (the proposals not complying with the Mayor of London’s Plan), and in relation to flood risk in the area.
2. A strong message should be sent to Development Control Committee to reject the proposals. It was also requested that the wide expression of views at both this and Surbiton Neighbourhood Committee should be conveyed to the Development Control Committee.
3. Concern about how the roundabout would work in practice – TfL have indicated that a 4th lane is unlikely to be used by drivers. Para 118 refers to an additional pedestrian crossing along the south western side of the roundabout – it is felt this section of road is too narrow and will need to be widened, and would be too dangerous for pedestrians to cross. There is already congestion on this roundabout.
4. Paras 136-138 indicate that the A3 will be reduced from 3 to 2 lanes in both directions under the bridge. TfL indicates that 2 lanes would not be sufficient capacity to take the volume of traffic which is evidenced on the A3 (one resident described as ‘one of the busiest roads in Europe’)and therefore this change to the layout will cause congestion.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Late MaterialReport | 70 KB | DownloadRead as text |
PDF |
PLANNING APPLICATIONSReport | 231 KB | Download |
Follow Surbiton Planning Sub-Committee at Kingston upon Thames and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 23 Apr 2014 | MINUTESRESOLVED that the minutes of the meeting held on 12 March 2014 are confirmed as a correct record. | Decided | Open |
| 23 Apr 2014 | Planning applicationsRESOLVED that the following application is refused as indicated. | Refused | Open |
| 23 Apr 2014 | 17 Avenue Elmers, Surbiton, Surrey, KT6 4SE.DECISION The application does not provide affordable housing and is therefore contrary to Policy DM15 of the Council’... | Decided | Open |
| 23 Apr 2014 | Application for Tree Works: 8 Hazel Bank, Surbiton.RESOLVED that: 1. the felling of the tree is permitted. 2. a suitable replacement tree is planted at the earliest opp... | Decided | Open |
| 12 Mar 2014 | MINUTESRESOLVED that the minutes of the meeting held on 22 January 2014 are confirmed as a correct record. | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.