RESOLVED to PERMIT subject to: 1) The conditions set out in the report and as amended by the Late Material and Committee as follows: · The addition of a requirement in relation to condition 29 (construction logistics plan): xxii) Details of a community liaison officer submitted to the local authority and for those details to be circulated to those who live and work in the surrounding area. · Strengthening of provision within the Legal Agreement (Section 10.2) to be positive in extolling the virtues of the site’s sustainability in terms of the capacity to access the site by non-private motor vehicles and alternative modes of transport. Conversely, the Legal Agreement provision will expressly disallow the advertisement of prevailing parking facilities in surrounding areas, specifically in relation to roadways where parking restrictions are lacking. · Amendment of provision within the Legal Agreement (Section 10.2) to increase the value of the developer’s financial contribution towards conducting a controlled parking zone (CPZ) consultation commensurate with expanding the scope of said consultation to include a greater number of zones under consideration. Voting : Unanimous. Recorded Vote Title Type Recorded Vote text Result To permit planning application 23/01189/FUL subject to planning conditions and the completion of a legal agreement. Resolution Carried View Recorded Vote for this item
Word for word from the decision Kingston upon Thames published for this meeting.Source: moderngov.kingston.gov.uk
Assistant Director of Strategic Planning & Infrastructure
INDEX
ITEM REGISTER NO ADDRESS DESCRIPTION RECOMMENDATION PAGE NO NO
A1 23/01189/FUL Site of Former Erection of a part four, part PERMIT A4 Service Station five and part six-storey subject to planning Coombe Road building comprising 29 nos. conditions and the Kingston Upon residential flats (Use Class completion of a Legal Thames C3a), inclusive of three Agreement KT2 7AB wheelchair accessible units, together with flexible commercial use (Use Class E), landscaping, amenity spaces and cycle parking.
A1 REPORT BY THE
Assistant Director of Strategic Planning & Infrastructure
PLANNING APPLICATIONS
All recommendations for planning permission in this section are automatically subject to the condition limiting the duration of the permission required by Sections 91 and 92 of the Town and Country Planning Act (as amended) 1990 unless permission is to be granted for a limited period or unless there is a specific recommendation that the period for such duration be other than the period referred to in the standard condition.
All Background Papers are available on the Council's website for review.
PLANS CZCR21-01 Site Location Plan (A3 1-500 & 1-1250) CZCR21-02B Proposed Site Layout & Roof Plan (A1 1-200) CZCR21-03B Proposed Site Layout & Ground Floor Plan (A1 1-200) CZCR21-04A Proposed Contextual Elevations & Sections (A1 1-200) CZCR21-05E Proposed Floor Plans (A1 1-200) CZCR21-06 Proposed Contextual Elevations (A1 1-100) CZCR21-07A Proposed Contextual Elevations (A1 1-100) CZCR21-08 Façade Detail (A3 1-25) CZCR21-09A Existing Highways Layout & Proposed Ground Floor Plan (A1 1-100) Existing LF344-Topographical-Rev A (1-200) Existing LF344-Elevation 1 (1-100) Existing LF344-Elevation 2 (1-100) Existing LF344-Secon-Rev A (1-100)
DOCUMENTS
Air Quality Assessment Aether_AQ_assessment_CoombeRd Arboricultural Impact Assessment MDJAC-23.017-AIA-01_APPS Biodiversity NET Gain L23405_TLP_Biodiversity Metric_Coombe Road_Kingston_20230427 L23405-TLP-BNG_Coombe Road_Kingston_20230427 Construction Logistics Plan R07-JP-Outline Construction Logistics Plan (231214) Transport Note (January 2024) Contaminated Land Assessment CZCR21- Accommodation & Amenity Schedule 13.09.23 Daylight and Sunlight Report Coombe Road KT2 March 2023 Design and Access Statement- CZ21 Design and Access Statement - Part 1 to 7 Drainage Assessment Form SUDS Energy Statement Non-Residential - 4569-CBC-HR-RP-S-001-P01 Energy Statement Residential - CZCR21_Energy Report Fire Statement - 22126-R-01-A
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.