Resolved
Application refused (in accordance with recommendation).
Planning Sub-Committee (Heavy Woollen Area) refused this item on Thursday 18 May 2017. Below is the council's own wording, with the papers it was decided on.
Resolved
Application refused (in accordance with recommendation).
DELEGATE approval of the application and the issuing of the decision notice to the Head of Development Management in order to complete the list of conditions including those contained within this report.
1.0INTRODUCTION:
1.1The application is brought to the Heavy Woollen Planning Committee as the application represents a departure from the Kirklees Unitary Development Plan. This is in accordance with the Council’s Scheme of Delegation.
1.2The principle of residential development has previously been established on this site through the granting of planning permission for the erection of two dwellings (under application reference 2016/90756) which was approved by the Heavy Woollen Planning Committee on 15 December 2016. In light of the recent planning history, the principle of development is still considered to be acceptable by officers.
1.3There would be no harmful effect on highway safety or residential amenity arising from the revised house type. On balance the design of the dwelling would not have an undue detrimental impact on the visual amenities of the surrounding area.
2.0SITE AND SURROUNDINGS:
2.1The application site is an open area of land to the rear of No.59 Far Bank at Shelley. The site is bounded by the garden area of No.53 Far Bank to the north, by undeveloped Green Belt land to the east, by undeveloped Provisional Open Land to the south, and by the rear garden areas of No.59 Far Bank to the west. 2.2 The site has an existing field access located between No. 59 and No.69 Far Bank. The site slopes downwards from west to east, and along the northern boundary are a number of mature trees. The site is allocated as Provisional Open Land on the Unitary Development Plan Proposals Map.
3.0PROPOSAL:
3.1Planning permission is sought for the erection of a detached dwelling which wold be constructed to ‘passive house’ standards. This is a standard for energy efficiency which results in ultra-low energy buildings that require little energy for space heating or cooling. The proposed dwelling would be two storeys in height and would have a box like structure with a flat roof. It is proposed the dwelling would be predominately constructed of timber cladding with coursed natural stone at ground floor level on the principal elevation only. The proposed dwelling would have an attached garage constructed of grey render, and habitable rooms are proposed in the southern, eastern and western elevations.
3.4Off-street parking and a private amenity space is proposed to serve the dwelling. Access would be as per the previously approved application; via a 5 metre wide tarmac roadway culminating in a turning head.
4.0RELEVANT PLANNING HISTORY:
4.12016/90756 – Erection of 2 detached dwellings – Conditional Full Permission
5.0HISTORY OF NEGOTIATIONS:
5.1The design of the dwelling was discussed with the applicant who wishes it to be determined on the basis of the submitted scheme.
6.0PLANNING POLICY:
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Planning Application: Application No: 2017/91074Report | 126 KB | DownloadRead as text |
Follow Planning Sub-Committee (Heavy Woollen Area) at Kirklees and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 8 Feb 2024 | Membership of the Sub-CommitteeCouncillor Sokhal substituted for the Labour Group vacancy. Apologies for absence were received on behalf of Councill... | Decided | Open |
| 8 Feb 2024 | Minutes of Previous MeetingApproved as a correct record. | Approved | Open |
| 8 Feb 2024 | Declaration of Interests and LobbyingNone declared. | Decided | Open |
| 8 Feb 2024 | Admission of the PublicDetermined. | Decided | Open |
| 8 Feb 2024 | Deputations/PetitionsNo deputations or petitions were received. | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.