Resolved
Application approved, in accordance with recommendation.
Strategic Planning Committee approved this item on Thursday 10 August 2017. Below is the council's own wording, with the papers it was decided on.
Resolved
Application approved, in accordance with recommendation.
Originator: Matthew Woodward
Tel: 01484 221000
Report of the Head of Strategic Investment
STRATEGIC PLANNING COMMITTEE
Date: 10-Aug-2017
Subject: Planning Application 2017/91111 Outline application for erection of industrial development for B1 (business), B2 (general industry), and B8 (storage and distribution) uses Station Road, Bradley, Huddersfield, HD2 1UT
APPLICANT Keyland Developments Limited
DATE VALID TARGET DATE EXTENSION EXPIRY DATE 31-Mar-2017 30-Jun-2017 17-Aug-2017
Please click the following link for guidance notes on public speaking at planning committees, including how to pre-register your intention to speak. http://www.kirklees.gov.uk/beta/planning-applications/pdf/public-speaking-committee.pdf ------------------------------------------------------------------------------------- LOCATION PLAN
78 88 7 2.5 m 84
ST A TIO N 33 Tk R O A D El Su b Sta
4 6 8
n tio 10 nc Ju ey ge ra dl Brid B Po s ts 5 1 .5m
As p i n Ho u s e
7 3 .8 m L T wr
SL
al Can ad B ro ld fie de rs ath gP BROOKLANDS 7
Hud w in Bra d l e y J u n c t i o n To Sh e l t e r In d u s tri a l Es t a te n io nct 1 Ju m ey .2 dl 51 Bra M P .5 3
Ta nk s
Sta t i o n 2 Ho u s e Ta n k
y d Bd ar W Ta n k s Si l o s e C oln er L Twr
Riv 7 2.2 m El Su b Sta 1
T CB W o rk s ) m (u th Pa 8
Pi p e Sl u i c e L i ne
As h l e y I n d u s tri a l Ou t fa l l 51 .5m k ac Es t a te Tr
We ir 1 78 9
D A Be c k v i e w
O R k
K Bu s i n e s s ac
N Tr
BA N Pa rk
O LT M ast
A D 2 1 5 1.5 m
Co l l i e ry Bri d g e
20 1 Ov e rf l o w Path Cycle
Drain Sl u i c e
Pipe Line Dra i n Pipe Line
Cycle Path Drain Vi a d u c t
51 .2m al d Can
74 .1m Broa
e oln
© Kirklees Council 100019241 2008 Bdy
er C field Ward
Riv th Pa
dders le Cyc
Hu
We ll
Map not to scale – for identification purposes only
Electoral Wards Affected: Ashbrow & Dalton Wards
Y/N Ward Members consulted (referred to in report)
RECOMMENDATION: Approve the application and the issuing of the decision notice to the Head of Strategic Investment in order to complete the list of conditions including those referred to within this report. 1.0 INTRODUCTION:
1.1The application is referred to Strategic Planning Committee on the basis that it involves non-residential development over 0.5ha in area.
2.0SITE AND SURROUNDINGS:
2.1The site is located approximately 4.3km north east of Huddersfield town centre in a predominantly industrial area. Access to the site is via Station Road.
2.2The application site is the former Bradley Waste Water Treatment Works (WWTW) and Depot. The site is located approximately 4.3km to the north east of Huddersfield and is covers an area of approximately 2.4ha.
2.3Access to the property is taken from Station Road which in turn joins the A62 Leeds Road. Station Road sits at a significantly higher level than the application site. The site is accessed via a narrow signalised bridge which crosses the railway and serves a number of other industrial units located to the north east of the site. Surrounding the site to the east is the Huddersfield Broad Canal, to the south is the Calder Valley Greenway and to the west is the main railway line from Huddersfield.
2.4The site boundaries comprise the railway line to the north, Marshalls CDP site to the east, canal to the south and Birkby Bradley / Calder Valley Greenway to the west.
2.5The site comprises a former waste water treatment site, although a large proportion of the site has revegetated. Views of the site are very limited owing largely to the extensive vegetation cover along the site boundary.
3.0PROPOSAL:
3.1The application is submitted in outline form with all matters reserved except for access.
3.2The application seeks outline consent for the erection of circa 3247m² of floor space set over 12 different sized units within the B1/B2/B8 use class. The submission indicates that buildings would be a maximum height of 8m to eaves.
3.3Access to the site would be from Leeds Road via Station Road and the existing traffic light controlled bridge. A new entrance and access road with control lights linked to the existing system is proposed.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Planning Application: Application No: 2017/91111Report | 14 pages | DownloadRead as text |
Follow Strategic Planning Committee at Kirklees and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 8 Oct 2026 | Planning Application - Application No: Planning Application 2021/93621Application approved (delegated). | Approved | Open |
| 23 Jul 2026 | Planning Application - Application No: 2025/92713Application approved (delegated). | Approved | Open |
| 11 Jun 2026 | Minutes of the Previous MeetingRESOLVED – The Minutes of the meeting held on 2 April 2026 be considered at the next meeting for approval. | Approved | Open |
| 11 Jun 2026 | Planning Application - Application No: 2025/92713Deferred. | Deferred | Open |
| 11 Jun 2026 | Planning Application - Application No: 2023/91907Approval delegated. | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.