Resolved
Deferred.
Strategic Planning Committee deferred this item on Thursday 30 November 2017. Below is the council's own wording, with the papers it was decided on.
Resolved
Deferred.
DELEGATE approval of the application and the issuing of the decision notice to the Head of Strategic Investment in order to complete the list of conditions including those contained within this report.
1.0INTRODUCTION
1.1The application is brought to the strategic planning committee for determination as the proposal involves the generation of more than 5MW of electricity.
2.0SITE AND SURROUNDINGS
2.1The application site is located approximately 0.5km south east of Batley town centre within an area which is without notation on the proposals map although it falls within a wider regeneration area. The immediate area surrounding the site has a mixed residential/commercial character. Whilst the site is on the periphery of an existing concentration of industrial/commercial uses, residential properties are situated both to the east of the site at a higher level and to the west on the other side of the A652 Bradford road. The main Dewsbury to Leeds railway line runs to the east of the site on an elevated embankment. The site forms part of a hard surfaced yard area measuring approximately 1650m² which appears to have been used as an overspill carpark for the former Batley Frontier Club which is now a fitness centre and Gym. A steep vegetated embankment, which includes mature trees, rises to the east of the site towards the railway embankment. Consequently, whilst the nearest residential properties are located approximately 130 metres from the boundary of the site, views of the site from these properties are screened.
3.0PROPOSAL
3.1The proposal is for the provision of a 20MW synchronous gas powered standby generation plant. Gas would be brought into the site via an underground pipeline to power the generators.
3.2The primary function is to provide electricity to the local distribution network at times of peak demand. This mechanism for balancing the system ensures a sufficient supply of electricity is readily available to local homes and businesses at all times. 3.3 The proposed development will primarily respond to calls from National Grid in times referred to as ‘stress events’ – when the electricity networks’ reserve power balance has been reduced due to a surge in demand, or reduced availability of large scale generation (i.e. coal, wind, solar).
3. 4 Accordingly, when required by National Grid, the facility will be turned on remotely, the gas combusted and the combustion gas would spin a turbine to generate up to 20MW electricity which is exported to the local distribution network via the nearest appropriate substation.
3.5The development comprises the following plant and equipment:
• 8 X 2.5 MW Gensets units located parallel to the access road, along the eastern boundary of the site. The engine containers will be 3.2 metres in height, within an additional 8.3m stack on top of them (totalling 11.5m in height). The engine units will be 15.4m X 3.2m
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Planning Application: Application No: 2017/93205Report | 10 pages | DownloadRead as text |
Follow Strategic Planning Committee at Kirklees and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 8 Oct 2026 | Planning Application - Application No: Planning Application 2021/93621Application approved (delegated). | Approved | Open |
| 23 Jul 2026 | Planning Application - Application No: 2025/92713Application approved (delegated). | Approved | Open |
| 11 Jun 2026 | Minutes of the Previous MeetingRESOLVED – The Minutes of the meeting held on 2 April 2026 be considered at the next meeting for approval. | Approved | Open |
| 11 Jun 2026 | Planning Application - Application No: 2025/92713Deferred. | Deferred | Open |
| 11 Jun 2026 | Planning Application - Application No: 2023/91907Approval delegated. | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.