Strategic Planning Committee, Thursday 24 March 2022 at 1.00pm

Planning Application - Application No: 2021/93073

Approved Planning 1 paper

Strategic Planning Committee approved this item on Thursday 24 March 2022. Below is the council's own wording, with the papers it was decided on.

Item11

Resolved

Delegate to the Head of Planning and Development to approve as detailed in the considered report subject to an additional condition covering details of the decommissioning of the facility.
Word for word from the decision Kirklees published for this meeting. Source: democracy.kirklees.gov.uk

Follow this further

Built from Kirklees's papers

What the report saysPro

Report to Strategic Planning Committee

Originator: Farzana Tabasum

Tel: 01484 221000

Report of the Head of Planning and Development

STRATEGIC PLANNING COMMITTEE

Date: 24-Mar-2022

Subject: Planning Application 2021/93073 Erection of energy storage facility contained within a fenced compound with associated landscaping and access works Land adj, Holme Bank Mills, Station Road, Mirfield, WF14 8NA

APPLICANT Peter Walker, Energy Optimisation Solutions

DATE VALID TARGET DATE EXTENSION EXPIRY DATE 04-Aug-2021 29-Sep-2021

Please click the following link for guidance notes on public speaking at planning committees, including how to pre-register your intention to speak. Public speaking at committee link

LOCATION PLAN

Map not to scale – for identification purposes only

Electoral wards affected: Mirfield

Ward Councillors consulted: Yes

Public or private: RECOMMENDATION: Conditional full permission

DELEGATE approval of the application and the issuing of the decision notice to the Head of Planning and Development in order to complete the list of conditions including those contained within this report.

1.0INTRODUCTION:

1.1The application is brought to the Strategic Planning Committee for determination under the terms of the Delegation Agreement, on the basis that the proposals are for non-residential development on a site in excess of 0.5ha.

2.0SITE AND SURROUNDINGS:

2.1The application site extends to approximately 0.7ha and is located on vacant land to the northwest of the Holmebank Business Park and south of the Huddersfield Railway Line, which runs in a west to east direction. Beyond the railway line, to the northeast of the site, are chemical works. Immediately to the south is a vacant field, beyond which lies the River Calder.

2.2The site is stated “to have previously been used in connection with the adjacent railway line and comprise of areas of hard standing and scrub vegetation”. The periphery of the site benefits from semi mature vegetation and forms part of the Wildlife Habitat Network (WHN), a strategic green infrastructure network along the River Calder Corridor. It lies to the southwest of the Wheatleys Viaduct, but is detached from this Grade-II listed structure.

2.3Parts of the existing access track to the site, which is served from Hurst Lane, lies within Flood Zones 2, 3a, 3a(i) (SFRA) and 3b, along with a very small area in the north-east corner of the site lying in Flood Zone 2 (no development is proposed on this part of the site).

3.0PROPOSAL:

3.1The proposed development comprises an energy storage facility contained within a fenced compound with associated landscaping and access. The layout of the proposed development is shown in the Proposed Site Plan (Drawing no. GA/003). Proposed elevations of the development are also provided. The proposals are confirmed to store approximately 42MW of energy.

3.2The equipment proposed comprises 18 high efficiency battery energy storage units (referred to as RSU on plans) and 18 inverter units (RIU on plans) housed within individual containers, each with a height of 3m. The proposals also include 1 substation with a height of 3m, 1 33kV/11kV TX Compound with a height of 5.76m, 1. RCU Unit with a height of 3m and 1 switch-gear container, also 3m in height. The battery containers are arranged in four rows, with the other equipment located in the southwest portion of the site. Whilst the final route of the power connection has not yet been confirmed, it is stated that the route intends to follow the railway line and will be located below ground where possible.

3.3The supporting statement states that the battery energy storage facility will support the National Grid and provide electricity at times when demand rises above generation and absorb excess electricity when demand is below the level of generation.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Planning Application: Application No: 2021/93073Report 328 KB DownloadRead as text

At this meeting

Whole meeting

On this subject at Kirklees

Search all
  1. Planning Application - Application No: 2021/93073This decision
  2. Planning Application - Application No: 2025/92459Approved
  3. Planning Application - Application No: Planning Application 2021/93621Approved
  4. Planning Application - Application No: 2026/90840Refused
  5. Planning Application - Application No: 2026/90484Refused
  6. Planning Application - Application No: 2025/92713Approved

More from Kirklees Strategic Planning Committee

All decisions
MeetingDecisionOutcome
8 Oct 2026 Planning Application - Application No: Planning Application 2021/93621Application approved (delegated). Approved Open
23 Jul 2026 Planning Application - Application No: 2025/92713Application approved (delegated). Approved Open
11 Jun 2026 Minutes of the Previous MeetingRESOLVED – The Minutes of the meeting held on 2 April 2026 be considered at the next meeting for approval. Approved Open
11 Jun 2026 Planning Application - Application No: 2025/92713Deferred. Deferred Open
11 Jun 2026 Planning Application - Application No: 2023/91907Approval delegated. Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies