RESOLVED – That planning permission be granted subject to the conditions as set out in the report of the Deputy Chief Executive and subject to the amendment of condition no. 15 so as to read:- “15. At least five working days written notice shall be given to the Local Planning Authority of the intention to commence development. The protective fencing referred to in condition 14 shall be in place prior to the written notice of the start of development being given to the Local Planning Authority and shall be retained in place until the development is complete. Reason To ensure that the proper protection of trees has been carried out in the interests of visual amenity and to comply with Policies DQ1 and DQ4 of the Knowsley Replacement Unitary Development Plan, adopted June 2006.”
Word for word from the decision Knowsley published for this meeting.Source: councillors.knowsley.gov.uk
GRANT planning permission subject to conditions ___________________________________________________________________
1. PROPOSAL
1.1The application proposes the erection of a 400kV substation with associated switchgear and electrical plant to the immediate east of the existing Kirkby Substation located at Mollys Lane, Kirkby. The site is classified as an existing major developed site within the Green Belt.
1.2The substation will comprise a number of elements that form part of a development of this type. The main building which will house the Gas Insulated Substation (GIS) is proposed to measure 21.38 metres wide, 45.7 metres in length and will be a maximum of 12.03 metres high.
1.3An additional generator will also be provided for backup power. This will be located immediately to the south of the main substation building. This building will measure 3 metres wide, 7 metres in length and will be 4 metres high.
2. BACKGROUND INFORMATION
2.1National Grid is the company responsible for transmitting high voltage power in England and Wales via a system known as the national grid. This is the “motorway” of the electricity system, by which the electricity produced by the generators flows down the national grid transmission network to the distribution network, ultimately reaching businesses and homes.
2.2Electricity can’t be stored in large quantities so part of National Grid’s role involves balancing the country’s demand and supply of it, minute by minute. Balancing supply and demand is becoming more difficult as intermittent generation, such as that supplied by wind and solar power – becomes a bigger part of the overall energy mix.
2.3National Grid’s substations are located where the “motorway” flow of high voltage electricity has to be transformed to lower voltage suitable for local needs. At the existing Kirkby Substation, electricity is transformed from 275kV down to 132 kV. Power is then further transformed down from 132kV by the local distributor (in Knowsley this is Scottish Power Energy Networks) in their adjacent substation to provide power sold by Suppliers to the end users. The voltage used in homes is just 230 volts.
2.4The British Energy Challenge.
The future for the power use in Britain sees the nation facing energy challenge to provide more energy and maintain security of supplies, whilst reducing carbon emissions.
There are 3 key energy challenges:
• Ensuring security of supply (taking into account the decline of traditional sources like coal powered power stations) • Meeting Britain’s carbon reduction targets • Providing power which people can afford.
2.5As a condition of its operating licence, National Grid must offer connections to these new energy sources in the most efficient manner, balancing costs with protecting the local environment, and the company aims to do this by making the most of the grids existing system of high voltage overhead electricity transmission lines and substations.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.