12/00095/FUL

Approved Planning 3 papers

Planning Committee approved this item on Thursday 6 September 2012. Below is the council's own wording, with the papers it was decided on.

Item18b

Resolved

RESOLVED – That planning permission be granted subject to the conditions as set out in the report of the Deputy Chief Executive and subject to the amendment of condition no. 15 so as to read:- “15. At least five working days written notice shall be given to the Local Planning Authority of the intention to commence development. The protective fencing referred to in condition 14 shall be in place prior to the written notice of the start of development being given to the Local Planning Authority and shall be retained in place until the development is complete. Reason To ensure that the proper protection of trees has been carried out in the interests of visual amenity and to comply with Policies DQ1 and DQ4 of the Knowsley Replacement Unitary Development Plan, adopted June 2006.”
Word for word from the decision Knowsley published for this meeting. Source: councillors.knowsley.gov.uk

Follow this further

Built from Knowsley's papers

What the report saysPro

Report to Planning Committee

Recommendation

GRANT planning permission subject to conditions ___________________________________________________________________

1. PROPOSAL

1.1The application proposes the erection of a 400kV substation with associated switchgear and electrical plant to the immediate east of the existing Kirkby Substation located at Mollys Lane, Kirkby. The site is classified as an existing major developed site within the Green Belt.

1.2The substation will comprise a number of elements that form part of a development of this type. The main building which will house the Gas Insulated Substation (GIS) is proposed to measure 21.38 metres wide, 45.7 metres in length and will be a maximum of 12.03 metres high.

1.3An additional generator will also be provided for backup power. This will be located immediately to the south of the main substation building. This building will measure 3 metres wide, 7 metres in length and will be 4 metres high.

2. BACKGROUND INFORMATION

2.1National Grid is the company responsible for transmitting high voltage power in England and Wales via a system known as the national grid. This is the “motorway” of the electricity system, by which the electricity produced by the generators flows down the national grid transmission network to the distribution network, ultimately reaching businesses and homes.

2.2Electricity can’t be stored in large quantities so part of National Grid’s role involves balancing the country’s demand and supply of it, minute by minute. Balancing supply and demand is becoming more difficult as intermittent generation, such as that supplied by wind and solar power – becomes a bigger part of the overall energy mix.

2.3National Grid’s substations are located where the “motorway” flow of high voltage electricity has to be transformed to lower voltage suitable for local needs. At the existing Kirkby Substation, electricity is transformed from 275kV down to 132 kV. Power is then further transformed down from 132kV by the local distributor (in Knowsley this is Scottish Power Energy Networks) in their adjacent substation to provide power sold by Suppliers to the end users. The voltage used in homes is just 230 volts.

2.4The British Energy Challenge.

The future for the power use in Britain sees the nation facing energy challenge to provide more energy and maintain security of supplies, whilst reducing carbon emissions.

There are 3 key energy challenges:

• Ensuring security of supply (taking into account the decline of traditional sources like coal powered power stations) • Meeting Britain’s carbon reduction targets • Providing power which people can afford.

2.5As a condition of its operating licence, National Grid must offer connections to these new energy sources in the most efficient manner, balancing costs with protecting the local environment, and the company aims to do this by making the most of the grids existing system of high voltage overhead electricity transmission lines and substations.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
12-00095 Location PlanPlan 149 KB Download
PDF
12-00095 Site PlanPlan 1.3 MB Download
PDF
12/00095/FULReport 155 KB DownloadRead as text

At this meeting

Whole meeting

On this subject at Knowsley

Search all
  1. 12/00095/FULThis decision
  2. 25/00458/FUL and 25/00459/LBC - Huyton Cricket Club, Huyton Lane, Huyton, Knowsley, L36 7XHAgreed
  3. 26/00054/ful - change of existing use from a dwelling (use class c3) to a family assessment centre (use class c2) for a maximum of two families together with the conversion of existing detached garage to form an office ancillary to the famiDecided
  4. 25/00681/FUL - The Installation oF 3No Antennas, 1No GPS Node and Associated Ancillary Development Thereto - Chads Parade, Kirkby Town Centre, Knowsley, L32 8RDNoted
  5. 23/02710/FUL - Erection of 29N0. Dwellings (Consisting of 23No. Houses and 6No. Apartments) Together with Associated Infrastructure and Access from Greensbridge Lane - Land At Former Merseyside Dogs Home, Greensbridge Lane, Halewood, Knowsley, L35 1QH.Agreed
  6. 25/00568/FUL - Erection of 3 No. Dwellings - Land at Thursby Walk, Southdene, KirkbyDecided

More from Knowsley Planning Committee

All decisions
MeetingDecisionOutcome
9 Jul 2026 25/00458/FUL and 25/00459/LBC - Huyton Cricket Club, Huyton Lane, Huyton, Knowsley, L36 7XHRESOLVED – That:- (i) In respect of planning application 25/00458/FUL that delegated authority be granted to the Head... Agreed Open
9 Jul 2026 26/00054/ful - change of existing use from a dwelling (use class c3) to a family assessment centre (use class c2) for a maximum of two families together with the conversion of existing detached garage to form an office ancillary to the famiRESOLVED – That delegated authority be granted to the Head of Planning & Building Control to grant planning permissio... Decided Open
9 Jul 2026 25/00681/FUL - The Installation oF 3No Antennas, 1No GPS Node and Associated Ancillary Development Thereto - Chads Parade, Kirkby Town Centre, Knowsley, L32 8RDRESOLVED – That delegated authority be granted to the Head of Planning & Building Control to grant planning permissio... Noted Open
9 Jul 2026 Delegated Planning DecisionsRESOLVED – That the report be noted. Noted Open
4 Jun 2026 25/00638/COU - Change of Use of Residential Dwelling (Use Class C3) to Childrens Care Home (Use Class C2), for a Maximum of 2 No. Children - 24 Brookdale Grove, Huyton, Knowsley, L14 8AGRESOLVED – That the application be granted subject to t he conditions set out in the attached schedule, or such addit... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies