Resolved
That planning permission be granted subject to the following conditions: Time Limits 1. The development shall commence not later than 3 years from the date of this permission. Reason: Imposed pursuant to Section 91 (1) (a) of the Town and Country Planning Act 1990 . Working Programme 2. The development shall be carried out, except where modified by the conditions to this permission, in accordance with the following documents: a) The Planning Application forms received by the County Planning Authority on 8th January 2013 amended on 6th February 2013. b) Submitted plans and documents received by the County Planning Authority on 8th January 2013: Drawing No. 0560/80023055/00/97/1001 Rev. B - Site Location and Access Plan Drawing No. 0560/80023055/00/97/1002 Rev. A - Proposed Site Layout Drawing No. 0560/80023055/00/97/4001 Rev. A - Existing Plans Screens Building Drawing No. 0560/80023055/00/97/4002 Rev. A - Existing Elevations Screens Building Drawing No. 0560/80023055/00/97/4004 Rev. A - Proposed Section and Elevations Screens Building Drawing No. 0560/80023055/00/97/4003 Rev. A - Proposed Roof Plan, Ground Floor Plan and Lower Ground Floor Plan Screens Building Drawing No. 0560/80023055/00/97/1004 Rev. A - Proposed Inlet Works MCC Kiosk Drawing No. 0560/80023055/01/01/1004 Rev. A – Contractors Access and Temporary Working Area Sheet 1 of 2 Drawing No. 0560/80023055/01/01/1005 Rev. A - Contractors Access and Temporary Working Area Sheet 2 of 2 Drawing No. 0560/80023055/00/97/1005 Rev. A – Existing Storm Screen Area showing works modification plan Drawing No. 0560/80023055/00/97/1006 Rev. A - Existing Storm Screen Area showing works modification elevations Reason: For the avoidance of doubt, to enable the County Planning Authority to adequately control the development and to minimise the impact of the development on the amenities of the local area Policies SC1, SC5 and E1 of the Lancaster District Core Strategy and Policies 2, 5, 37 and 103 of the Lancashire Minerals and Waste Local Plan. Control of Noise 3. All plant, equipment and machinery used in connection with the construction phase of the development, including those works carried out with the benefit of permitted development rights, shall be equipped with effective silencing equipment or sound proofing equipment to the standard of design set out in the manufacturer's specification and shall be maintained in accordance with that specification at all times throughout the construction phase of the development including those works carried out with the benefit of permitted development rights. Reason: To safeguard the amenity of local residents and adjacent properties/landowners and ... view the full minutes text for item 5.