Resolved
Resolved :- That subject to the amendment to condition 4 as set out above, planning permission be granted subject to the following conditions: Time Limits 1. The development shall commence not later than 3 years from the date of this permission. Reason: Imposed pursuant to Section 91 (1) (a) of the Town and Country Planning Act 1990. 2. The mining operations authorised by this permission shall cease not later than 30 September 2028. The site shall be progressively restored in accordance with the conditions of this permission and shall be finally restored by 30 September 2029 or within 12 months of the cessation of mining operations whichever is the earlier. Reason: Imposed pursuant to schedule 5 of the Town and Country Planning Act 1990 and to conform with Policy 107 of the Lancashire Minerals and Waste Local Plan . Working Programme 3. The development shall be carried out, except where modified by the conditions to this permission, in accordance with the following documents: a) The Planning Application received on 12 April 2013 b) Submitted Plans and documents: Drawing no. THQ/PA/S13 16, Rev B - Location Plan Drawing no. THQ/PA/S11 17 - Proposed position of stone storage and dressing area. Drawing no. THQ/PA/S11 01 - Plan showing existing site layout with proposed order of phasing. Drawing no. THQ/PA/S11 02 - Plan showing initial box cut of Phase 1 and construction of temporary mineral overburden bund. Drawing no. THQ/PA/S11 03 - Plan showing excavation design of Phase 2 and provision for overburden backfill within the quarry. Drawing no. THQ/PA/S11 04 - Plan showing excavation design of Phase 3 and provision for overburden backfill within the quarry. Drawing no. THQ/PA/S11 05 - Plan showing excavation design of Phase 4 and provision for overburden backfill within the quarry. Drawing no. THQ/PA/S11 06 - Plan showing excavation design of Phase ... view the full minutes text for item 8.