Resolved
That the County Council's interim response to the consultation and the concerns raised by the Cabinet Member for Environment, Planning and Cultural Services, be noted.
Development Control Committee noted this item on Wednesday 18 January 2017. Below is the council's own wording, with the papers it was decided on.
Resolved
That the County Council's interim response to the consultation and the concerns raised by the Cabinet Member for Environment, Planning and Cultural Services, be noted.
The County Council's interim response to a consultation by National Grid on its North West Coast Connections project, a nationally significant infrastructure project, linking the proposed new nuclear power station at Moorside in Cumbria to the national distribution network in Carlisle and in Heysham.
Recommendation – Summary
To note the County Council's interim response to the consultation and the concerns raised by the Cabinet Member for Environment, Planning and Cultural Services.
The North West Coast Connections project (NWCC) is a nationally significant infrastructure project proposed by National Grid. It consists of 4 new 400kv transmission circuits (a series of power lines carried on a run of new pylons or underground) linking the proposed new nuclear power station at Moorside in Cumbria to the national distribution network in Carlisle and in Heysham. In Lancashire the project will consist of a tunnel carrying the cables under Morecambe Bay, a tunnel head building with cooling fans, and a substation extension.
The proposal is for this to be constructed over several years, expected to start in 2019. Construction will consist of the sinking of two tunnel heads, one on land north of Middleton and a smaller one just off Penrod Way, and the boring of a tunnel under Heysham and Morecambe Bay, together with the construction of an islet in the middle of Morecambe Bay. The tunnel head site at Middleton is likely to see a significant level of construction works and vehicle movements, albeit for a temporary period of time.
Under Section 42 of the Planning Act 2008 (the Act) National Grid is required to consult with local authorities on their proposal before they submit their application to the Planning Inspectorate. National Grid is also consulting with the public and land owners at this stage, under Section 47 of the Act.
On the 5 January 2017, the Cabinet Member for Environment, Planning and Cultural Services considered a report setting out the County Council's interim response to the North West Coast Connections consultation. A copy of the report is available to view via the following link:
http://council.lancashire.gov.uk/ieDecisionDetails.aspx?ID=9594
The Cabinet Member approved the recommendations set out in the report but in doing so, raised the following concerns:
Insufficient attention has been given to construction and operational design at the tunnel heads to ensure impacts can be sufficiently mitigated particularly given that construction work may last up to six years.
No meaningful mitigation is proposed to address noise, vibration, air quality, light, ecology or residential amenity impacts at the tunnel head;
Residential/school receptors should be classed as ‘high’ sensitivity for a range of impacts. This has not been accepted in the submitted assessments and impacts on all the predictions and outcomes;
There is incomplete workforce planning and accommodation proposals at the tunnel-heads;
The level of construction materials and tunnel spoil generated will place extensive pressure on existing transport infrastructure. A multi-modal option is the only acceptable solution.
Cabinet Member decisions are not usually reported to the Development Control Committee; however, as this is a nationally significant infrastructure project, it is felt appropriate to do so. It is also considered appropriate to highlight the concerns raised by the Cabinet Member which also reflect those raised by the Council's Officers.
This consultation ran from 28 October 2016 to 6 January 2017.
Consultations
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
North West Coast Connections Project: Proposed Route Alignment StageReport | 99 KB | DownloadRead as text |
PDF |
View item 10. as DOC 150 KBReport | 2 pages | Download |
Follow Development Control Committee at Lancashire & Rossendale and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 15 Jul 2026 | Minutes of the last meeting held on 10 June 2026That the minutes of the meeting held on 10 June 2026 be confirmed and signed by the Chair. | Decided | Open |
| 15 Jul 2026 | West Lancashire Borough: application number LCC/2025/0022. Ravenhead Quarry, Chequer Lane, Up Holland, WN8 0DDThat planning permission be granted , subject to the conditions detailed in Appendix 'A'. | Decided | Open |
| 15 Jul 2026 | West Lancashire Borough: application number LCC/2025/0023. Ravenhead Quarry, Chequer Lane, Up Holland, WN8 0DDThat planning permission be granted , subject to: (i) The conditions detailed within Appendix 'A'. (ii) An amendment ... | Decided | Open |
| 15 Jul 2026 | Decisions taken on development control matters by the Director of Environment and Planning in accordance with the County Council's Scheme of DelegationThat the report be noted. | Noted | Open |
| 15 Jul 2026 | Date of Next MeetingThat the next meeting of the Committee be held on Wednesday, 2 September 2026 at 10.00am in Committee Room B – The Di... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.