Resolved
That planning permission be granted subject to the conditions set out in the report to the committee.
Development Control Committee decided this item on Wednesday 3 March 2021. Below is the council's own wording, with the papers it was decided on.
Resolved
That planning permission be granted subject to the conditions set out in the report to the committee.
Application - Construction of a multi-use games area with a 3m high perimeter fence. Reedley Primary School Reedley County Primary School, Reedley Road, Reedley, Burnley.
Recommendation – Summary
That planning permission be granted subject to conditions controlling time limits, working programme and surface water drainage.
Applicant’s Proposal
The proposed development is to install an all-weather games area on the existing playing field. The proposed multi-use games area (MUGA) would measure 30m by 15m with a 3m high ball stop fence and gates to the perimeter. The MUGA would occupy approximately 450sqm of the school playing field and would have a permeable surface with a soakaway underneath and be marked out with playing pitches for a number of sports.
Description and Location of Site
Reedley Primary School is located on the south side of Reedley Road in a residential area approximately 1km to the south east of Brierfield town centre. The school and its grounds are bordered to the north by Reedley Road, to the east by residential properties on Reedfield, to the south by residential properties on Meadow Close and to the west by residential properties on Ravens Close. The nearest residential properties to the proposed MUGA are approximately 17m away on Ravens Close and 30m away on Meadow Close.
Background History: The site is an established primary school where the following permissions have been granted:
Single storey infill extension to create a new infant classroom and resource facility was granted in February 2005 (ref 13/05/0002).
Single storey extension to provide additional teaching accommodation was granted in July 2004 (Ref: 13/04/0360).
Installation of a temporary classroom with covered walkway to the entrance was granted in October 2012 (Ref 13/12/0419).
Single storey extension creating four classrooms with ancillary toilet and cloakroom accommodation and the erection of a canopy was granted June 2013
Planning Policy
National Planning Policy Framework
Paragraphs 11 – 14, 91, 94, 97 and 124 - 132 are relevant with regard to the definition of sustainable development, protection of playing fields, the need for educational development, enabling and supporting a healthy lifestyle and the need for good design.
Pendle Local Plan Part 1 Core Strategy
Core Strategy Policy ENV2 - Achieving Quality in Design and Conservation Core Strategy Policy SDP1 - Presumption in Favour of Sustainable Development Core Strategy Policy SUP1 - Community Facilities Core Strategy Policy SUP 2 - Improve Health and Wellbeing Core Strategy Policy SUP3 - Education and Training
Consultations
Pendle Borough Council: - No objection
Reedley Hallows Parish Council : No comments received
LCC Highways Development Control: - No objection
Sport England: - The site is not considered to form part of a playing field as a fence has been constructed over the field reducing the functional area of the field. As the facility is only of local benefit, Sport England do not wish to comment on the proposals although the local authority should assess the proposal against the guidance in paragraphs 96 and 97 of the National Planning Policy Framework.
Lead Local Flood Authority: - No comments received
Coal Authority: - The proposed development lies within a coal mining area which may contain unrecorded coal mining related hazards. If any coal mining feature is encountered during development, this should be reported immediately to the Coal Authority
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Pendle Borough: application number. LCC/2020/0070 Construction of a multi-use games area with a 3m high perimeter fence. Reedley County Primary School, Reedley Road, Reedley, Burnley.Report | 241 KB | DownloadRead as text |
PDF |
PowerPoint slidesReport | 659 KB | Download |
PDF |
View item 7. as DOCX 25 KBReport | 5 pages | Download |
Follow Development Control Committee at Lancashire & Rossendale and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 15 Jul 2026 | Minutes of the last meeting held on 10 June 2026That the minutes of the meeting held on 10 June 2026 be confirmed and signed by the Chair. | Decided | Open |
| 15 Jul 2026 | West Lancashire Borough: application number LCC/2025/0022. Ravenhead Quarry, Chequer Lane, Up Holland, WN8 0DDThat planning permission be granted , subject to the conditions detailed in Appendix 'A'. | Decided | Open |
| 15 Jul 2026 | West Lancashire Borough: application number LCC/2025/0023. Ravenhead Quarry, Chequer Lane, Up Holland, WN8 0DDThat planning permission be granted , subject to: (i) The conditions detailed within Appendix 'A'. (ii) An amendment ... | Decided | Open |
| 15 Jul 2026 | Decisions taken on development control matters by the Director of Environment and Planning in accordance with the County Council's Scheme of DelegationThat the report be noted. | Noted | Open |
| 15 Jul 2026 | Date of Next MeetingThat the next meeting of the Committee be held on Wednesday, 2 September 2026 at 10.00am in Committee Room B – The Di... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.