Resolved
That outline planning permission be approved, subject to the following conditions, as set out in the report, and amendment of conditions 3, 7 and 36: 1. Outline permission – all reserved matters required except access. 2. Masterplan drawings are illustrative only. 3. At least 10% on site renewable energy – details required. 4. Affordable housing scheme to be agreed in accordance with the Council’s adopted policy at the time of the Reserved Matters application. 5. Provision of an area of public open space – details required. 6. Public art/realm – details required. 7. Require applicant to remove Polo Tower in accordance with a timetable of works to be agreed. 8. Temporary hoardings to Marine Road West – details required. 9. Landscaping scheme – details required. 10. Retention of all existing trees/hedges unless otherwise agreed in the detailed landscape scheme. 11. Tree protection scheme – details required. 12. Boundary treatments – details required. 13. Adoptable highway details required. 14. Construction of a new access – details required including its precise location. 15. On-site footpath/cycle links to Cedar Street, Grove Street, Highfield Crescent and Phase 1 to be agreed. 16. Off-site works to facilitate pedestrian/cycle linkages. 17. Travel plan – details required. 18. Car parking – details required. 19. Cycle parking – details required. 20. Site management arrangements for construction period (including security fencing). 21. Construction hours 0800 to 1800 Monday to Saturday only. 22. Wheel cleaning facilities (temporary during construction) – details required. 23. Noise assessment and control. 24. Construction noise – pile driving. 25. Scheme for dust control. 26. Standard land contamination condition. 27. Contaminated land – importation of soil and materials. 28. Contaminated land – prevention of new contamination. 29. Bunding of tanks. 30. Scheme for odour control – cooking and food. 31. Ventilation details. 32. Separate drainage system. 33. Use of SUDS. 34. Provision of interceptor – car parks. 35. Refuse storage – details required. 36. At least Level 3 of Code for Sustainable Homes. 37. Bat survey to be undertaken prior to any works on site commencing, and the mitigation measures to be agreed with the Local Planning Authority and implemented. and the following additional condition (suitably worded): 38. Scheme for play area(s) and outdoor sports space/area.
Word for word from the decision Lancaster published for this meeting.
Source: committeeadmin.lancaster.gov.uk