That the application be approved, subject to the following conditions, as set out in the report, with amendment to conditions 6, 8 and 11: 1. Standard Time Limit. 2. Development to be carried out in accordance with the approved plans. 3. Before development commences, a scheme of an appropriate alternative pedestrian access shall be submitted and approved. 4. Prior to the building being brought into use, the above access shall be provided in full. 5. Prior to the building being brought into use, pedestrian guard rails and other highway improvements shall be provided to the east side of the A6. 6. (Amend to the wording specified in the County Council’s letter of 26 th March 2010.) 7. Levels shall be set at a minimum of 300 mm above ground level. 8. Car parking and secure, covered cycle provision to be provided and retained. 9. Details of all external materials to be submitted and agreed. 10. Hours of construction – Monday to Saturday, 0800 hours to 1800 hours. 11. Hours of operation 0800 to 0100 daily . 12. External doors to be self-closing. 13. Use to be limited to the purposes indicated on the application. And subject to the following conditions (suitably worded): 14. Details of energy measures linked to specific phases. 15. Unforeseen land contamination.
Word for word from the decision Lancaster published for this meeting.Source: committeeadmin.lancaster.gov.uk
Galgate Cricket Club Pavilion Erection of a village hall (amendment to previously approved application 07/00044/FUL) Main Road
Galgate
Lancashire
Name of Applicant Name of Agent
[name removed] Nick Gillibrand
Decision Target Date Reason For Delay
7 May 2010 Committee Cycle
Case Officer [name removed] None
Summary of Recommendation Approval subject to conditions
1.0The Site and its Surroundings
1.1This site is located within the existing sports field to the south of the village of Galgate. The site is currently occupied by a small cricket pavilion. To the west lies the cricket ground with the River Conder and open fields beyond. To the north lies the tennis courts and bowling green surrounded by open fields and allotments. To the east lies the football ground with the Plough Inn, 6 terraced houses, the A6 and the west coast main line embankment beyond. To the south lies the Lancaster Canal with open fields beyond. At present the site is only accessed from the A6 adjacent to this between the terrace of cottages and the pub car park.
1.2The site is allocated in the Local Plan as countryside area.
2.0The Proposal
2.1The submitted application is for an amendment to the design of the village hall building previously approved under 07/00044/FUL. This earlier application was a full application to demolish the cricket pavilion and to erect a new multi purpose Village Hall to replace the existing facility in Stoney Lane.
2.2Following the granting of planning consent in March 2007, the Big Lottery Fund awarded a £25,000 development grant to take the scheme forward. This came in two parts: Design Development and Environmental Analysis. In response to this the design has evolved resulting in a complete redesign of the shape and appearance of the approved village hall.
2.3The analysis of the original approved design concluded the following weaknesses (list not exhaustive):
• The phasing concept presented several drawbacks including unattractive and temporary elevations in a number of places; poor layout resulting in building sites for future phases to be in inconvenient locations and, in inadequate facilities in the short term; • Excessive bulk in the approved building which would be inefficient in terms of cost and energy efficiency;
• Fragmented design of elevations which will be overly expensive;
• Unsuitable functional layout – poor relationship between the main halls for social functions;
• Design lacked presence (not sufficiently iconic) for a community building.
2.4The revised amendment to the village hall has been reduced in volume and height with layouts revised to accommodate a more functional community hall in phase 1 and the following phases. This has allowed £130,000 of energy saving devises to be designed into the scheme. The revised design has provided improved access and parking arrangements together with the presenting a building of iconic significance. The design has evolved from a building with various pitched roofs and traditional form to a building of equally simple form but with a single roof with curved eaves creating a distinct shape with large overhang.
2.5The overall ridge height of the new village hall is approximately 7.8m, with an eaves height varying between approximately 3.5m and 2.2m because of its curved construction. Phase 1 of the building has an approximate footprint of 26m by 21m. The total footprint measures 48m x 21m. The building shall be constructed using a timber structural frame finished in render, timber cladding and stone gables when the final phases are constructed. The roof shall be stainless steel, made from recycled steel, with roof glazing at the ridge. The fenestration detail predominantly consists of large sections of glazing with timber cladding.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Car Park Nelson Street LancasterResolved : That the application be approved subject to the following conditions: 1. Development in accordance with Ap...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.