Resolved
That, subject to delegation back to the Head of Regeneration and Policy to negotiate amendments to the S106 agreement, Outline Planning Permission be granted, the revised S106 agreement requiring: 1. An affordable housing contribution of up to 25% provision (67% of which to be social rented and 33% of which to be shared ownership housing), dependent on viability of the development at the time of consideration of the Reserved Matters. 2. A transport contribution towards bus services and footpath links. 3. A highway improvement contribution towards the improvements to the Quernmore Road/ Derwent Road junction. And discussions with the applicant’s agent regarding the rewording of 4, as follows: 4. Provision of open space in a variety of forms and locations to be determined at the Reserved Matters stage. It was also added that a route towards the Moor Hospital Annex be considered as part of the desirable items in the legal agreement. And subject to the following conditions, as set out in the report: 1. Outline permission – Reserved Matters required (except access) 2. Travel Plan – details required. 3. Adoptable highway details required – constructed and completed prior to occupation. 4. Off-site highway improvements – details required, then approved scheme to be constructed and completed prior to occupation. 5. New pedestrian and cycle routes – details required. 6. Provision of garages and car parking. 7. Cycle parking – details required. 8. Wheel cleaning facilities (temporary during construction). 9. Boundary treatments – details required. 10. Landscaping – details required. 11. Protection of trees and hedges during construction. 12. Retention of trees and hedges. 13. Provision of equipped children’s play facilities, open space and kickabout areas – details and phasing plan required. 14. 10 year maintenance of recreational facilities referred to in Condition 13. 15. Hours of construction – 0800 – 1800 Monday to Saturday. 16. Construction noise and vibration. 17. Standard contaminated land condition. 18. Contaminated land – importation of soil, materials and hardcore. 19. Contaminated land – prevent of new contamination. 20. Bunding of tanks. 21. Scheme for dust control. 22. Separate drainage system. 23. Use of SUDS – surface water discharge from the site should be attenuated to existing site levels or less. 24. Refuse storage – details required. 25. Removal of Permitted Development rights. 26. At least 10% of the predicted energy requirements to be met by on-site renewable energy generation. 27. Achieve at least Level 3 of the Code for Sustainable Homes.