Resolved
That Outline Planning Permission be renewed, subject to the following conditions, as set out in the Case Officer’s report: 1. Outline planning permission timescale (all matters reserved) – 8 years. 2. Development to accord with approved documents 3. Drawings are for illustrative purposes only. 4. Comprehensive mixed use development scheme, including phasing – details required. 5. Comprehensive management scheme for the whole site – public facilities, amenity spaces, foot and cycle ways and public realm works. 6. Samples of all external building materials, pointing, cladding, rooflights , balconies, balustrades, window and door frames, including finishes and colours. 7. Samples of external surface materials and boundary treatments. 8. Stonework cleaning and restoration. 9. Historic metal windows to part of Building 5 to be re-used or used as a template for replacements. 10. Details of the Reception Space required. 11. Details of the river front artwork feature required. 12. Use of the buildings to be controlled by condition. 13. Landscaping scheme (including planting schedule and maintenance). 14. Provision of recreational open space and equipped children’s play area. 15. Bat mitigation measures to be implemented. 16. Separate drainage system. 17. Oil interceptors to car parking areas. 18. Surface water drainage works. 19. No development or planting within 8m of the inner face of the river defence wall. 20. Finished floor levels – to be agreed. 21. Land south of St. George’s Quay to be provided with a 0.5m layer of clean fill. 22. No development within 3m of a public sewer. 23. Adoptable highway details required. 24. Off site highway improvement works to St. George’s Quay, Long Marsh Lane and Westbourne Road/Station Road junction. 25. Scheme for the provision of bus services to serve the site. 26. Travel Plan. 27. Detailed traffic management scheme for the remediation and construction phase, including feasible alternative options for the removal of waste and provision of fill. 28. Wheel cleaning during construction. 29. Visibility splays – to be retained. 30. Car parking – details required. 31. Mobility car parking. 32. Cycle parking – details required. 33. Motorcycle parking. 34. Parking management scheme – details required. 35. Bins storage – details required. 36. No materials or equipment to be stored on site outside buildings, except within agreed bin storage facilities. 37. Hours of construction – 0800 to 1800 Monday to Saturday. 38–41. 4 contaminated land conditions. 42. Asbestos. 43. No pile driving. 44. Noise assessment and control. 45. No external loudspeaker systems. 46. Dust control. 47. Ventilation details. 48. Odour control – cooking and food. 49. External lighting. 50. Affordable housing scheme. 51. At least 10% on site renewables . 52. Residential – meet at ... view the full minutes text for item 168.