Resolved
That Outline Planning Permission be granted, subject to the following conditions, as set out in the case officer’s report: 1. Outline consent – reserved matters required (except means of access). 2. Illustrative drawings only – not approved as part of the application. 3. Development of the site shall be restricted to a maximum of nine dwellings of a height no more than two storeys. 4. Hours of Construction 0800 – 1800 Monday to Friday, 0800 to 1400 Saturday. 5. Demolition and construction management schedule to be submitted and approved. 6. Standard contamination conditions. 7. Development to be drained on a separate system. 8. Full details of the access road and connection to the existing highway to be agreed. 9. Scheme required for off-site highways works to be submitted and agreed before commencement of development. 10. No occupation of the development to take place before the approved highway scheme is implemented in full. 11. Recommendations and mitigation of the bat survey to be incorporated into any development scheme. 12. Provision of artificial nesting sites to be agreed and implemented. 13. Tree protection measures to be agreed. 14. Landscaping scheme to be agreed. 15. Tree Protection Plan to be implemented in full in accordance with bs 5837 (2005). 16. Arboriculture Method Statement is required. 17. Schedule of tree works to be submitted and agreed in writing. 18. Precise details of existing and proposed ground and floor levels. 19. Boundary details. 20. On-site renewable energy provision. And subject to the following additional condition (suitably worded): 21. Code Level 3. And to the issue of a covering letter from the Assistant Head of Regeneration and Policy (Development Management) advising the applicant regarding the parameters of the outline scheme and the need for detailed engagement with local residents and the Development Management Team with regard to site layout.