That, in order to give an indication of which way Members would have voted, had the application been determined by Committee, Planning Permission be refused for the following reasons, as set out in the case officer’s report, with deletion of reason 7 detailed in the case officer’s report: 1. There are no ‘exceptional circumstances’ arising from the application that justify such a major proposal within an Area of Outstanding Natural Beauty, and as a consequence the application is contrary to PPS7 and PPS22. 2. The development is of an inappropriate scale given its location within an Area of Outstanding Natural Beauty and Countryside Area, and is therefore contrary to PPS7 and PPS22, Core Strategy Policy EM1 and saved Local Plan policies E3 and E4. 3. The development would have an adverse visual impact upon the landscape, contrary to PPS1 and PPS22, and RSS policies DP7 and EM1(a) and Core Strategy policies SC1, SC3, SC5 and E1, and saved Local Plan policy E3. 4. The development would have an adverse cumulative visual impact upon the environment, contrary to PPS1 and PPS22 and RSS policies DP7 and EM1(a) and Core Strategy policies SC1, SC3, SC5 and E1. 5. The development’s impact on biodiversity, including within the Biological Heritage Sites, has not been adequately assessed, and consequently appropriate mitigation ... view the full minutes text for item 6.
Word for word from the decision Lancaster published for this meeting.Source: committeeadmin.lancaster.gov.uk
Land at Claughton Quarry, Claughton Moor, Renewable Energy project comprising the erection of Claughton, Lancashire, 13 wind turbine generators, each with a maximum Farleton Old Road, Claughton height of 126.5 metres, together with associated access track, hard standing areas, control and substation building, borrow pits, meteorological mast and temporary construction and site storage compounds on Claughton Moor and Whit Moor near Lancaster
Name of Applicant Name of Agent
Community Windpower Ltd [name removed] Target Date Reason For Delay
1 March 2011 Submission and consideration of additional information
Case Officer [name removed] No
Summary of Recommendation Refusal
1.0The Site and its Surroundings
1.1The 338 hectare application site is located across the highest sections of Whit Moor, Caton Moor and Claughton Moor, with a small section of the site extending out to the A683 between the settlements of Claughton and Farleton in the River Lune valley. The centre point of the site falls c11km east of the Lancaster City Centre. The land is predominantly covered with boggy grassland and is currently used for rough grazing for sheep and cattle.
1.2The surrounding land is classified as moorland hills and moorland fringes with some areas of wooded rural valleys. Access to Whit Moor is generally by foot or horse along the local footpath or bridleway network. Vehicular access is restricted as far as Claughton Hall to the north west and Caton Moor wind turbines (via Quarry Road) to the south west. A further track, which serves a property named Winder, runs parallel to the southern boundary.
1.3The site falls within the Forest of Bowland Area of Outstanding Natural Beauty (AONB), the District’s Countryside Area and part of Claughton Moor County Biological Heritage Site (BHS). The south west boundary of the site is shared with Caton Moor BHS. The access track runs along the boundary of Faithwaite Wood for 2 short sections and across grassland adjacent to these woods, both of which are designated as BHSs. The track also runs close to a Scheduled Monument. The becks and gills that form the natural drainage across the application site flow into the River Lune to the west, which is a BHS, and to the River Roeburn in the east, which flows through a series of BHSs and Outhwaite Wood Site of Special Scientific Interest (SSSI).
2.0The Proposal
2.1The application seeks planning permission for 13 wind turbines across the tops of Whit Moor, Claughton Moor and Caton Moor, with associated infrastructure. This associated infrastructure includes: • 80m meteorological mast • c5km of access track from the A683 • c5.5km of further tracks connecting from the access track to all 13 wind turbines • c5.5km of cable trenches from the turbines to the sub-station • 8 borrow pits (not part of this application) • Crane hardstanding areas • Construction compound (to be removed post construction) • Site storage compound (to be removed post construction) • Sub-station • 13km of underground cabling from the sub-station to the nearest grid connection point (not part of this application)
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Car Park Nelson Street LancasterResolved : That the application be approved subject to the following conditions: 1. Development in accordance with Ap...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.