Resolved
That, subject to entry into a S106 Agreement for the control of holiday accommodation, Planning Permission be granted, subject to the following conditions, as set out in the Case Officer’s report: 1. Standard 3 year time limit. 2. Development to be undertaken in accordance with the approved plans. 3. Amended plans – 2 nd August 2011. 4. Lodges shall be restricted to holiday use only. 5. Separate system of drainage. 6. Details of foul and SW drainage required. 7. Provision of new vehicular access prior to occupation. 8. Closure of existing access prior to occupation. 9. Cycle Storage – details to be agreed. 10. Visibility splays (4.5 m and 215 m) to be provided. 11. Scheme of the off-site highway works to be agreed. 12. No occupation of trading until off-site highway works are undertaken. 13. Control of maintenance/emergency access to be agreed. 14. Manager’s accommodation to be the only permanent residential unit used only in association with the development. 15. Renewable energy provision – details to be agreed. 16. Amenity areas details and provision before use of the lodges. 17. Hours of construction – 8.00 a.m. to 6.00 p.m. Monday to Friday and 8.00 a.m. to 2.00 p.m. Saturday only. 18. Contaminated land conditions. 19. No site clearance, preparation or development work shall take place until a scheme of bat roosting opportunities that will be incorporated into the development has been submitted and approved. 20. No site clearance, preparation or development work shall take place until a scheme of mitigation for common toads has been submitted and approved. 21. No site clearance, site preparation or development work shall take place until lighting proposals have been submitted and approved. 22. Tree felling, clearance and demolition works to be avoided between March and July inclusive, unless the absence of nesting birds has been confirmed by further surveys or inspections. 23. No site clearance, preparation or development work shall take place until a landscaping scheme (including habitat creation, enhancement and management) has been submitted and approved. 24. Detailed Arboricultural Method Statement to be submitted and agreed. 25. Scheme for Additional Tree Planting to be agreed. 26. Scheme for the Protection of Trees (during building operations) to be agreed. 27. Retention of Existing Trees/Hedges. 28. Materials and finish to be permeable road surfacing.