Resolved
That Outline Planning Permission for a Science Park be granted, subject to the following conditions, as set out in the case officer’s report: 1. Outline permission (5 years) – Reserved Matters required (except access) 2. Illustrative drawings only. 3. Entry criteria. 4. Phasing plan. 5. At least 10% on site renewables . 6. All buildings to achieve a BREEAM rating of excellent, or equivalent. 7. Car Parking Management Strategy. 8. Car Parking –details required (including mobility spaces). 9. Secured bicycle storage. 10. Secured motorcycle storage. 11. Off-site highway improvements to be provided by way of a S278 agreement to include: a) the provision of 2 Quality Bus stops (one on either side of the A6 in the vicinity of the site access); b) the provision of cyclepaths along the A6 in either direction of the access junction, totalling 950 m in length; c) the provision of a foot/cycle path link from the site’s southern boundary to the University’s cycle infrastructure in the vicinity of Lake Carter; and d) the provision of up to 2.65 km of further off-site designated foot/cycle paths (locations to be agreed with the Local Planning Authority in conjunction with the Highways Authority). 12. Off-site highway improvements ‘a’, ‘b’ and ‘c’ listed in Condition 11 shall be constructed and available for use prior to the occupation of any building on site. In terms of highway improvement ‘d’ , no more than 11,000 sq m gross internal area (GIA) of development shall be occupied until 1.35 km of off-site designated foot/cycle paths has been provided. Up to 1.3 km further off-site designated foot/cycle paths shall be constructed prior to the occupation of more than 23,000 sq m (GIA) of development. 13. 2 internal cyclepaths . 14. Lancaster Science Park Transportation Steering Group – monitor data pursuant to condition 15 and performance of the Travel Plan (condition 16). 15. No development pursuant to this permission shall be occupied until: (a) Full details of an automated system to monitor the number of vehicle trips to and from the site, including the timing for its implementation, has been submitted to and approved in writing by the Local Planning Authority, in consultation with the Highway Authority and the Secretary of State for Transport. (b) The system referred to in condition 15(a) has been implemented, and is operating to the satisfaction of the Local Planning Authority, in ... view the full minutes text for item 175.