Resolved
That Planning Permission be granted, subject to the following conditions, as set out in the case officer’s report: 1. Standard 3 year timescale. 2. Development to accord to approved (amended) plans – plans to be listed. 3. Materials, including colours and finishes (ground floor glazing system, windows, doors, elevational treatment, roof material, balconies). 4. Surface and boundary treatments. 5. Car parking – as per plan – with no more than one space allocated per flat. 6. Cycle storage – as per plan. 7. Bin storage – as per plan. 8. Site access and off site highway works. 9. Works referred to in Condition 8 to be completed prior to first occupation of the development or the development is opened for trading. 10. 20% over and above Part L Building Regulations 2010. 11. Separate drainage system. 12. Surface water management system. 13. Hours of construction (Monday to Friday 0800-1800 and Saturday 0800-1400). 14. Construction noise and vibration. 15. No pile driving. 16. Hours of retail use (0700-2200 Monday to Saturday and 1000-1600 Sunday). 17. Hours of retail deliveries (0700-2200 Monday to Saturday and 1000-1600 Sunday). 18-21. 4 standard contamination conditions. 22. Secured by design. 23. CCTV. 24. Measures to be taken to protect trees adjoining the site. 25. Construction management plan – storage of materials, deliveries, construction waste, site compound, parking of vehicles and equipment. And subject to the following additional condition (suitably worded): 26. No occupation of the scheme – either for retail or residential use – shall occur until a landscaping plan is submitted in writing to, and approved in writing by, the Local Planning Authority. The Plan shall indicate precise areas of new street tree planting and details of all tree removals.