Resolved
That planning permission be granted, subject to the signing and completion of a Section 106 Agreement covering: 100% affordable housing provision (including tenure, phasing and occupancy criteria). And the following conditions, as set out in the case officer’s report, with the removal of condition 23 (sustainable urban drainage system) and renumbering of the subsequent conditions: 1. Standard planning permission timescale. 2. Amended plans. 3. Development to accord with plans – list approved plans. 4. Notwithstanding the plans details and samples of all external materials. 5. Submission of surface materials. 6. Removal of permitted development rights. 7. Reuse of stone. 8. Building recording and analysis. 9. At least Code Level 3. 10. Scheme for additional planting, including landscaping management plan. 11. Implement approved arboriculture implications assessment including tree protection. 12. Arboriculture Method Statement required. 13. Further precautionary bat survey shall be undertaken immediately prior to commencement of works. 14. Details of replacement bird nesting habitat and opportunities to be installed within the site. 15. Removal of Japanese knotweed. 16. Measures identified in the landscape plane regarding enhancements for bats, hedgehogs, amphibians and birds. 17. Structural survey of the existing retaining wall to the Lancaster Canal towpath following removal of the trees along the eastern boundary and for all remedial works to be completed prior to first use or occupation. 18. Adoptable highway details required. 19. Provision of car parking areas – as per plan. 20. Cycle storage – details to be agreed. 21. Wheel cleaning – during construction. 22. Separate drainage system. 23. Scheme for the disposal of foul and surface waters. 24. Scheme for the provision and implementation of a surface water regulation system. 25. Hours of construction 0800-1800 Monday to Friday and 0800-1400 Saturday only. 26. Scheme for dust control – earth moving and construction activities. 27. Construction noise – pile driving condition. 28. External lighting. 29. Contaminated land conditions x4.