That planning permission be granted subject to the following conditions: 1. ST01 – Standard Timescale 2. ST08 – Development in accordance to the approved scheme 3. Full details (sample) of external materials 4. Full details (sample) of hard landscaping materials 5. Tree/Landscaping conditions 6. Unforeseen Contaminated Land Condition 7. Highways Condition (Wheel cleaning facility) 8. As may be required by Consultees
Word for word from the decision Lancaster published for this meeting.Source: committeeadmin.lancaster.gov.uk
Site For Engineering Building Erection of new engineering building (4692sqm) comprising of workshops, offices, teaching and Lancaster University research laboratories, communal areas and the provision of new external landscaping Bailrigg Lane
Lancaster
Name of Applicant Name of Agent
[name removed] Paul Hughes
Decision Target Date Reason For Delay
29 May 2013 None
Case Officer [name removed] No
Summary of Recommendation Approval
1.0The Site and its Surroundings
1.1Lancaster University lies approximately 3 miles south of Lancaster City Centre between Bailrigg and Galgate on moderately raised land between the A6 Scotforth Road and the M6 Motorway. The site which forms the subject of this application for the proposed Engineering Building is the site of the former University Sports Centre which is situated between the Management School, the Lancaster Environment Centre and the Biology Building on the eastern side of the spine road (South West Drive) which forms the western boundary of the main Lancaster University Campus buildings. The site is currently bound by existing buildings towards the north, east and south with two open fenced netball courts immediately towards the west.
1.2The Former Sports Centre has an overall site area of approximately 0.5 hectares and is constructed over three storeys on a significantly lower land level of approximately 1.5m to that of Farrer Avenue which is located to the north of the building. Currently unoccupied and awaiting demolition, the building is constructed of a buff coloured brick over two storeys and a white rendered third floor which is the highest part of the building towards the east all of which are contained under a flat roof. All sporting facilities, including the swimming pool, have been successfully relocated to the new facility off the main University access road.
1.3The application site is allocated within the Lancaster District Local Plan proposals map as ’Lancaster University Campus’. There are no other designations that immediately affect the site.
2.0The Proposal
2.1Following demolition of the existing building (the demolition already benefits from prior approval consent), the current application seeks full planning permission for the construction of a new four- storey Engineering Building. The Ground Floor of the proposed building will consist of ‘heavy’- engineering workshops and laboratory spaces with bike stores and service yard, at first floor the proposal includes main workshops, team project areas and a range of office and meeting rooms, chemical laboratories and departmental meeting rooms. At third floor the proposal includes open plan offices, engineering research laboratories, breakout space and engineering and electrical laboratories and the fourth floor consists mainly of academic and open plan offices.
2.2The proposed building will have a total floor space of 4692sq.m, and is proposed to take the form of two fingers with a central atrium connected by horizontal bridges that act as staircase landings. Each wing is approximately 60m long divided into ten, 6m structural bays. The northern finger measures 12m wide and is made up over 3 storeys and the southern finger is 10.5m wide and 4 storeys high. They key proposed materials include buff brick, glass reinforced concrete (GRC) and powder coated metal.
2.3The new bike and bin storage area will be located towards the west, contained within an external service yard which is accessed from Gillow Avenue. The main entrance to the building will be located under a large canopy to the east. The car parking arrangements are proposed to remain unchanged.
2.4The proposal also includes additional landscaping. This includes an area of public realm within the entrance forecourt with the inclusion of new tree plantation separating pocket square towards the north east and the proposed entrance plaza and a meadow area west of the proposed building.
3.0Site History
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Car Park Nelson Street LancasterResolved : That the application be approved subject to the following conditions: 1. Development in accordance with Ap...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.