That Planning Permission be granted but delegated back to Officers to conclude an issue regarding Television reception, and also subject to the following conditions: 1. Development to commence within three years. 2 List of approved plans. 3. Phasing Plan of the respective blocks. 4. Access Details. 5. Section 278 highway works. 6. Finished Floor Levels. 7. Site Investigation. 8. Land Contamination Report. 9. Construction Management Plan. 10. Written scheme of investigation followed by programme of archaeological work. 11. Surface Water Drainage Scheme to include maintenance strategy. 12. Foul drainage scheme. 13. Landscaping details. 14. Public Realm Surfacing and Landscaping. 15. Refuse, provision for drop off and cycle storage (including detail of cycle storage). 16. Security Measures (CCTV). 17. Glazing Measures. 18. Ventilation Measures. 19. Building Materials. 20. Travel Plan. 21. Servicing and maintenance plan. 22. Refuse storage arrangements. 23. External lighting. 24. Façade cleaning and Maintenance regimes of the elevations. 25. Communal Satellite systems. 26. Flood evacuation measures. 27. Sustainable Energy. 28. Removal of Permitted Development Rights (GPDO 2015 Schedule 2 Part 16 - Communications). 29. Student Occupation Only. 30. Development in accordance with Flood Risk Assessment. 31. Vegetation clearance (only to be undertaken during bird breeding season if ecology walkover undertaken) – the walkover is to include the City Council’s consultee. 32. Development in accordance with the AIA.
Word for word from the decision Lancaster published for this meeting.Source: committeeadmin.lancaster.gov.uk
Land adjacent to Bulk Road Erection of eight buildings up to eleven storeys in Lancaster height to create student accommodation comprising Lancashire 125 studios (C3), 50 cluster flats (C3/sui generis), 19 shared townhouses (sui generis), with ancillary communal facilities, study library (D1), gymnasium (D2), new vehicular and pedestrian accesses, car parking, servicing bays, public realm and landscaping
Name of Applicant Name of Agent
[name removed] Mike Harris
Decision Target Date Reason For Delay
6 December 2016 (Time Extension Agreed until 12 Amended plans and resolving air quality, design and January 2017) highway issues
Case Officer [name removed] No
Approval (Subject to the resolution with respect to Air Summary of Recommendation Quality)
(i) Procedural Note
A site visit was arranged for Elected Members, and was undertaken on 7th November 2016. There has been a subsequent delay in the report being drafted due to ongoing discussions taking place with all relevant parties/consultees, and to enable the applicant to seek to address issues of air quality, design and highways.
1.0The Site and its Surroundings
1.1The development site is located to the north of Lancaster City Centre located between Back Caton Road and Bulk Road, and the site area is in the region of 0.89 hectares. The site is currently scrubland, and has formally accommodated the K-Shoes factory and a vehicle dismantler, however has been derelict for the last 20 years. To the west of the site lies Back Caton Road with industrial development beyond this in the form of a car wash, carpet shop and laundry cleaning business, together with Kingsway Retail Park. To the far north of the site lies residential properties and beyond this is the former bus depot apartment block (8 storeys in height), and properties on Bulk Road and Gladstone Terrace are located to the west of the proposal. To the south lies Bulk Road beyond which is the former Crown Inn on St Leonards Gate, adjacent to this is St Leonards Court (retirement apartments) and Britten Hall, and a computer shop. Parliament Street Retail Park is located to the south.
1.2The site is somewhat of an island positioned between two highways. The southern half of the site is a 60 metre urban block width being around 120 metres in length, and the northern part of the site is a narrow strip of around 22 metres in width and 90 metres in length. It is bound by an alleyway to the rear of the existing two storey terraced properties on Bulk Road. The site has challenging topography, and rises steeply from east to west with the highest part of the site being approximately 13.5m Above Ordnance Datum (AOD) and the low point (running adjacent to Caton Road) is 7m AOD. The existing boundary is characterised by a tall, stone-built retaining structure predominately of grit-stone.
1.3The sites south eastern corner and a small sliver of the western boundary falls within Flood Zone 2 and 3, and the development falls within the Lancaster Air Quality Management Area. There are a group of trees subject to a Tree Preservation Order on the far northern aspect of the site under Order 387 (2006), which relates to the trees within the embankment. There is a scattering of self- seeded trees and vegetation which has regenerated naturally.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Car Park Nelson Street LancasterResolved : That the application be approved subject to the following conditions: 1. Development in accordance with Ap...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.