That subject to the receipt of further consultation responses from the statutory consultees, Planning Permission be approved subject to the below conditions: 1. Timescales. 2. Approved Plans. 3. Ecological Mitigation. 4. Submission of finished floor levels. 5. Access Details. 6 Offsite highway works (fully implemented prior to first occupation). 7. Car Parking in accordance with approved details including submission of Car Parking Management Plan. 8. Access to the south of the site to be permanently stopped up. 9. Cycle Facilities. 10 Contaminated Land. 11. Foul Drainage. 12. Surface Water Drainage. 13. Landscaping (Hard and Soft Landscaping). 14. Building Materials (Accommodation blocks, refuse, motorcycle, cycle and refuse stores, fencing and gates and acoustic fencing). 15. Noise Mitigation. 16.. Ventilation. 17. Student Accommodation Only. 18. Security Measures. 19. 20. Electric Vehicle Charging Points. Water vole survey required prior to commencement of drainage works.
Word for word from the decision Lancaster published for this meeting.Source: committeeadmin.lancaster.gov.uk
Filter House Erection of two 4-storey student accommodation Scotforth Road buildings comprising of 28 6-bed cluster flats (C4) Lancaster with associated car parking and bin and cycle stores Lancashire
Name of Applicant Name of Agent
William Mason [name removed] Target Date Reason For Delay
27 February 2017 Not applicable
Case Officer [name removed] Yes
Approval (Subject to No Objections from National Summary of Recommendation Grid and Environmental Health Officers otherwise the scheme be refused)
1.0The Site and its Surroundings
1.1The application site relates to a parcel of land of 0.8ha on the west side of the A6, south of the urban area of Lancaster. The site is triangular, around 240m in length from north to south and 60m in width at the north end, tapering to a point at the southern end. The site is located within designated countryside area approximately 3km from Lancaster City Centre. Under the saved Local Plan the site is allocated for business use and adjoins land to the east (opposite the A6) that is allocated for the Bailrigg Science Park (Health Innovation Campus).
1.2The site remains vacant and has done now for some considerable length of time. It was occupied by a former water filter house which has since been demolished. The only building now on the site is an electricity substation which dates from the 1960’s. The site has suffered from quite extensive vandalism and graffiti over recent years.
1.3The application site is tightly positioned between the A6 to the east of the site, which is a busy strategic vehicular access corridor into and out of the city, and the West Coast railway line to the west side. It therefore occupies a very prominent position at the southern gateway to the city. Beyond these access corridors the site is surrounded by open countryside, predominately used for agricultural purposes. Burrow Beck runs along the northern boundary of the site and is identified as a Biological Heritage Site. It also forms part of the Urban Greenspace designation which creates a natural edge to the boundaries of the urban area of Lancaster.
1.4Vehicular access to the site is directly from the A6 into an area of hardstanding previously used for servicing and car parking. There is a pedestrian footway on the opposite (east) side of the A6 but no pedestrian crossing, although there is a pedestrian refuge at the centre of the carriageway. The south bound bus stop adjoins the site at its southern end whilst the north bound stop is opposite the northern part of the site. The closest strategic cycle network is to the east of the A6 near the settlement of Bailrigg. This cycle path links the residential areas of South Lancaster to the University. 2.0 The Proposal
2.1The proposed development consists of two purpose-built accommodation blocks. The first of which is a 4 storey building which measures 14 metres in height at its highest point and would be 107 metres in length by 11 metres wide. The proposed materials consist of un-coursed stone facing to the ground floor, with darkened larch along the A6 frontage and native larch cladding within the inner courtyard elevation. The roof material would consist of a membrane in lead effect finish with standing seams.
2.2Block B is located north of the existing substation on the site, and would be 30 metres in length, 8 metres in width and a maximum of 14 metres in height. Materials would include a mix of native larch cladding and un-coursed stone to the lower ground floor.
2.3The proposed accommodation consists of student “cluster unit” consisting of 28 flats, being up to 6 bedrooms per cluster flat. In total the scheme would provide for 168 bedrooms across the two buildings. Car parking is to be provided in the form of 38 car parking spaces. Cycle stores would accommodate 56 bicycles, and provision is also made for refuse storage together with amendments to the position of the site access.
3.0Site History
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Car Park Nelson Street LancasterResolved : That the application be approved subject to the following conditions: 1. Development in accordance with Ap...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.