That Reserved Matters be approved subject to the following conditions: 1. Time limit for reserved matters. 2. Development to be constructed in accordance with approved plans (list of drawings). 3. Precise details of the pedestrian connection to the east of the site adjacent to plot 21, together with a timetable for implementation. The link shall be retained at all times thereafter. 4. Notwithstanding the details submitted, samples and specifications of all materials to the external face of the dwellings, including surfacing materials/stonework detailing, to be agreed with the LPA. 5. Details of the substation to be agreed. 6. Details of the location, size and finish of external cycle storage for plots without garages to be agreed and implemented before occupation of respective dwellings and retained at all times thereafter. 7. Landscaping to be implemented and maintained. 8. Tree protection and implementation in accordance with amended Arboricultural Implications Assessment and Arboricultural Method Statement. 9. Parking to be provided in accordance with the site layout plan and provided before occupation and thereafter retained with garages use limited to parking/storage. 10. Removal of PD (extensions, roof additions, outbuildings). 11. No insertion of new, altered windows/doors. 12. Removal of PD relating to the formation of hardstanding adjacent to a highway. 13. Removal of PD relating to fences, gates and means of enclosures adjacent to a highway.
Word for word from the decision Lancaster published for this meeting.Source: committeeadmin.lancaster.gov.uk
Land Between Low Road And Forge Lane Reserved matters application for the erection of 76 Halton dwellings with associated landscaping Lancashire
Name of Applicant Name of Agent
[name removed] N/A
Decision Target Date Reason For Delay
22 November 2017 Negotiations on design and viability matters Extension of time agreed until 13th April 2018
Case Officer [name removed] None
Approve, subject to the Council’s Tree Protection Summary of Recommendation Officer and GMEU being satisfied with the proposed planting proposals.
1.0The Site and its Surroundings
1.1The application site relates to approximately 5 hectares of agricultural land divided into three fields situated within the settlement of Halton. The site is accessed off Low Road opposite the community centre and playing fields. The site is bound by Low Road to the north (with residential and community uses beyond); existing residential development (Forgewood Drive) to the north east; an agricultural field benefiting from an outline planning permission for 60 dwellings to the south east; the redeveloped Halton Mills site to the south (including Lancaster Cohousing); and Town End Farm (now a residential conversion complex with paddock) to the west. The surrounding land uses are predominately residential, though there are existing employment uses abutting the site to the south within the Halton Mills site (Wenning House, Riverside House, and Out of the Woods).
1.2The site is located adjacent to the village Conservation Area which contains a number of listed buildings. Town End Farmhouse (and curtilage listed barns – all grade II listed) and the Grade II* Manor House are the closest listed buildings to the site. The site is also relatively close to the boundary of the Forest of Bowland Area of Outstanding Natural Beauty (AONB). The River Lune Biological Heritage Site and its associated recreational corridor is located to the south of the site, albeit separated by the Halton Mills development. The south-eastern corner of the proposed site abuts the Lancaster Cohousing site where public footpath FP01 runs from Mill Lane through the Cohousing site along the northern banks of the River Lune towards the Crook of Lune.
1.3The topography of the site varies with the land positioned between Low Road and Forge Lane appearing relatively flat, though there is a very gradual incline from the western end of the site at circa 14m Above Ordnance Datum (AOD) to the eastern boundary at circa 25m AOD. The site then extends southwards and wraps around Wenning House and Riverside House where land rises steeply to 36m AOD at its highest point. A belt of protected trees are positioned on a steep escarpment (between 24-34m AOD) on this section of the site with land falling to the far southern part of the site towards Mill Lane to approximately 21m AOD. The existing boundary treatments are made up of stone walls (to the north and west), mature hedgerows (to the eastern and far southern boundaries) with tree planting and fencing along the boundary with Forge Lane.
1.4The site is allocated in the saved Local Plan as a Geological Heritage Site (GHS) with the majority of the site protected for minerals (mineral safeguarding land). There are a number of protected trees within the site with the most notable being those located on the elevated part of the site in the south- eastern corner and the single tree close to the western boundary. The site is predominately in flood zone 1, with a slither of land to the far south east being in flood zone 2 and 3 (within 25m of the River Lune).
2.0The Proposal
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Car Park Nelson Street LancasterResolved : That the application be approved subject to the following conditions: 1. Development in accordance with Ap...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.