That the application be deferred to allow officers to review the potential for noise emissions from the overhead powerlines on the amenity of the proposed dwellings and to review the planning (tilted) balance in light of the Council’s 5 year housing land supply position, and the development proposal’s lack of affordable housing provision and the lack of an education contribution.
Word for word from the decision Lancaster published for this meeting.Source: committeeadmin.lancaster.gov.uk
Proposal Erection of 9 dwellings with associated infrastructure and landscaping
Application site Land at Low Road, Halton, Lancashire
Applicant Forge Weir View Limited, Wrenman Homes
Agent N/A
Case Officer [name removed] No
Approval, subject to United Utilities and the Lead Local Flood Authority Summary of Recommendation being satisfied with the revised drainage details
(i) Procedural Matters This application has been amended during the cause of the determination of the application. It is now for 9 dwellings and no longer constitutes major development. Under the scheme of delegation such applications do not require determination of Planning Regulatory Committee. However, because the proposal forms an integral part of a wider scheme and has been the subject of considerable objection, it has been referred to the Planning Regulatory Committee by the Service Head for Planning and Place.
1.0Application Site and Setting
1.1The application site relates to part of a former agricultural field located adjacent to the south eastern edge of the village of Halton behind the Forgewood residential estate. The field in question has recently been developed for housing by Wrenman Homes. The application site relates to part of the wider site (previously permitted for 5 dwellings) and includes more of the pastureland to the east (towards the pylon and overhead lines), totalling 1.2 acres. The site is currently being used as a site compound, comprising hard standings, stock piling of earth and the provision of welfare/office cabins.
1.2The site is located within a housing allocation (policy H2) as identified by the Strategic Policies and Land Allocations DPD and is approximately 150m from the boundary with the Forest of Bowland Area of Outstanding Natural Beauty (AONB). The site is approximately 550m from Halton’s Conservation Area. The River Lune is located approximately 40m from the most southern part of the site and enjoys a biological heritage site (BHS) designation. This designated area extends up to the application site boundary. There are protected trees, covered by a single Tree Preservation Order (TPO 321(2001) located to the south of the site. The closest public right of way is situated along Mill Lane to the south of the site (but not adjacent or connected to it). The site sits between approximately 40m and 36m Above Ordnance Datum (AOD).
2.0Proposal
2.1The application site overlaps with the extant and implemented planning permission for 60 dwellings. The proposal seeks to substitute two plots (accommodating 2 detached 4 and 5 bedroom dwellings) Page 1 of 13 CODE 20/00277/FUL on the approved scheme to provide a small extension to the approved development comprising 9 dwellings in total. The proposal results in a net gain of 7 additional dwellings, bringing the whole development to a total of 67 dwellings. The development has been amended from a scheme of 11 dwellings to 9 during the determination period to address design and amenity concerns.
2.2The proposal includes the erection of 2 two-bedroom semi-detached dwellings, 4 three-bedroom semi-detached dwellings; 2 three-bedroom link detached dwellings and 1 4-bedroom detached dwelling arranged around a new cul-de-sac. Access is proposed off the main spine road within the new residential estate between plots 18 and 24. The proposed dwellings are all two-storey buildings, designed and finished to reflect the house types of the approved development. The dwellings shall be finished in a combination of render, natural stone and timber-effect cladding under slate roofs.
2.3The development results in a larger ecology/landscape buffer at the southern tip of the site and additional landscaping to the north. A field access is proposed off the new cul-de-sac to provide suitable access to maintain and manage the proposal ecology buffer and landscaping along the eastern boundary.
3.0Site History
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Car Park Nelson Street LancasterResolved : That the application be approved subject to the following conditions: 1. Development in accordance with Ap...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.