That the application be approved subject to the conditions set out in the Committee Report and that the Head of Planning and Place be delegated to approve the application after the consultation period has expired subject to there being no new material planning issues raised in any further representations subject to the following conditions: 1. Time limit. 2. Approved plans. 3. Final Sustainable Drainage Strategy. 4. Construction Phase Surface Water Management Plan. 5. Foul Water Drainage. 6. Employment Skills Plan. 7. Access construction. 8. Contaminated land. 9. Building recording and written scheme of archaeology. 10. Details of fenestration/rainwater goods/details for converted buildings. 11. Finished floor levels (extra care building) and site levels. 12. Off site highway works. 13. Materials samples. 14. Homeowner packs. 15. Landscaping details. 16. Completion of conversion. 17. Travel Plan. 18. Drainage Operation and Maintenance Plan and Verification Report. 19. Security details. 20. Car parking management strategy, cycle store and EV charging points. 21. Approved tree works. 22. Ecological mitigation measures. 23. Hours of construction. 24. Landscaping Implementation. 25. Nesting birds. 26. Separate drainage. 27. Sustainable construction and energy efficiency. 28. Nationally described space standards and M4( 2) and M4(3) standards. 29. Removal of Telecommunications Apparatus Permitted Development. 30. Extra Care Use within C3 Only. 31. Affordable Housing. 32. Retention of pedestrian/cycle routes.
Word for word from the decision Lancaster published for this meeting.Source: committeeadmin.lancaster.gov.uk
Demolition of buildings including Sarah Witham Thompson, Gressingham and Melling Halls, Black Box Theatre, Old Dining Room and the Long Corridor and erection of a 4 storey Extra Care residential building (use class C3), partial demolition, conversion and change of use of the Art Studio from education facility (use class D1) Proposal to ancillary space associated with the Extra Care residential building and change of use and conversion of Barbon Hall and Hornby Hall from education facility (use class D1) to provide affordable residential apartments (use class C3) with associated landscaping, parking, access and service infrastructure
Application site University of Cumbria, Bowerham Road, Lancaster, Lancashire
Applicant University of Cumbria & NWSDL
Agent Clare Bland
Case Officer [name removed] No
Approval but delegated back to the Head of Planning and Place to Summary of Recommendation allow the consultation period to expire
1.0Application Site and Setting
1.1This is one of two applications on the agenda for separate developments at the University of Cumbria (UoC) campus off Bowerham Road. This application was deferred from the last meeting due to late concerns expressed by the LLFA and United Utilities which officers felt could not be overcome through imposition of conditions and to seek assurances from the applicant over the accuracy of the submitted visual imagery. The applicant has submitted additional information relating to the proposed drainage system which has been assessed by the LLFA and United Utilities and confirmed the images are reasonably accurate based on Google street view. The 3D model has been inserted into the photo context to provide an indicative view of the proposal within its context.
1.2This site is at the southern end of the campus near the junction of Coulston Road and Golgotha Road. The buildings to be converted are the Barbon and Hornby Halls (former barrack married quarters). The new build element will be situated to the rear (north east) of these between them and the retained College North and South buildings with its south east elevation facing and close to Coulston Road. The art studio is situated abutting the boundary wall with Coulston Road close to the Golgotha Road pedestrian/cycle entrance.
1.3To the south, west and east are residential roads outside the campus. To the north west is the site of the proposed replacement student accommodation block (see report on application 20/00550/FUL). To the north and north east is the densely developed university campus buildings and circulation routes.
1.4The precise location of this development is within the adopted Strategic Policies and Land Allocations DPD (SPLA) policy EC6 developable area of the campus and the heritage led residential Page 1 of 11 CODE 20/00554/FUL site (H3.3). It is outside the key urban landscape (EN5).
2.0Proposal
2.1This application is for demolition of a number of university buildings, the majority of which have been vacant for some time, and replacement with a 3 and 4 storey block of self-contained extra care residential apartments. Occupants will receive individual levels of care as required. Also proposed is conversion of two non-designated heritage asset buildings to provide open age apartments with no provision of care. All units will be operated by Progress Housing and be available for affordable rent at 20% below market rent levels. Accommodation will be subject to a Local Letting Plan. There will be 92 extra care units (67x1 bed and 25x2 bed) and 16 created by the conversion (8x2 bed and 8x1 bed).
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Car Park Nelson Street LancasterResolved : That the application be approved subject to the following conditions: 1. Development in accordance with Ap...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.