Installation of a 99.9MW battery storage facility with ancillary development including 3m high fencing, battery storage containers, substation, transformers, switchroom, control room, welfare cabin Proposal and storage room, construction of internal access points, creation of hardstanding and turning area, erection of gates and 4m high CCTV columns, creation of temporary compound area, raising of land levels and construction of new access onto the A683 Bay Gateway
Application site Land North of A683 Bay Gateway, Heaton With Oxcliffe
1.1This is 1.7ha of agricultural land with access track with associated hardstanding. It is in the open countryside immediately north of the A683 Bay Gateway approximately 1.4km southeast of Heysham centre. To the north and east is agricultural land and to the west is the Walney Offshore Windfarm Extension facility. Within fields immediately close by to the north and northwest and across the A683 to the southeast and southwest are a telecommunications tower, solar farm, 3 no. wind turbines and electricity pylons.
1.2The site is within Heysham Power Station 1 & 2 middle zone; Morecambe Bay SPA zone; SSSI impact zone and at risk of <25% risk of groundwater flooding. It is partly within flood zones 3 (benefitting from flood defences), 2 and 1.
2.0Proposal
2.1The proposal is to construct a fenced area of 12,540sqm to house battery storage containers, substation, transformers, switch room, control room, welfare cabin and store. A new access is proposed directly onto the A683 serving the facility’s turning/parking area and adjoining agricultural land. Landscaping belts are proposed to the north and east and all existing boundary hedgerow and trees are to be retained.
2.2The eastern part of the site will be raised by up to 1m above existing ground level due to the land’s slope and raise that end above potential flood level. The tallest equipment will be the switchgear and transformers up to 7.1m high in the northwest corner of the site. The metering room will have a 5.3m to ridge pitched roof. The flat roofed containers housing the batteries, transformers, switch and
Page 1 of 6 CODE 21/00695/FUL control rooms will be 3.1m high. CCTV cameras will be mounted on 4m high poles and the site fencing will be 3m high.
2.3The facility will contribute towards helping the national grid provide a reliable source of power in the face of fluctuating and changing energy demand and supply. At times the grid struggles to provide an efficient, consistent supply of energy due to variations in demand and unreliability of renewable energy supplies. Energy storage facilities like this offer flexibility to absorb surplus energy and release when needed, including from renewable sources and without causing air pollution during this process.
3.0Site History
3.1There are no relevant applications relating to this site.
4.0Consultation Responses
4.1The following responses have been received from statutory and internal consultees:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Car Park Nelson Street LancasterResolved : That the application be approved subject to the following conditions: 1. Development in accordance with Ap...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.