Resolved : That the application be approved subject to the following conditions: 1. Standard 3 Year Timescale; 2. Development in accordance with approved plans; 3. Employment Skills Plan and Method Statement; 4. Construction and Traffic Management Plan; 5. Construction Environmental Management Plan; 6. Final Surface Water Sustainable Drainage Strategy; 7. Construction Surface Water Management Plan; 8. Site-Specific Verification Report for the Surface Water Drainage System; 9. Site-Specific Operation and Maintenance Manual for the Surface Water Drainage System; 10. Site-Specific for the Foul Drainage System; 11. Details and Samples of External Materials to the Building and External Surface Materials; 12. Provision of Parking and Turning Head in accordance with the approved plan; 13. In accordance with submitted Ground Investigation and Contamination Assessment and Validation of Remediation Strategy; 14. In accordance with submitted FRA; 15. In accordance with submitted AIA; 16. In accordance with submitted Travel Plan Framework; 17. In accordance with submitted Preliminary Ecological Appraisal and Bat Survey; 18. In accordance with the mitigation set out within the Energy Statement to be BREEAM Very Good Standard.
Word for word from the decision Lancaster published for this meeting.Source: committeeadmin.lancaster.gov.uk
Demolition of part of existing warehouse building (B2) and detached outbuilding, refurbishment and recladding of remaining warehouse, installation of solar panels to the roof, erection of 2 storey rear office Proposal extension, associated access, parking, service yard, refuse storage, landscaping and drainage infrastructure
Sofidel UK Caton Road Application site Quernmore Lancashire
Applicant GVS Real Estate UK
Agent [name removed] Officer [name removed] No
Summary of Recommendation Approval, subject to conditions
1.0Application Site and Setting
1.1The application site relates to a 2.4 hectare of an existing industrial site located to the far east of Caton Road Industrial Estate. Caton Road Industrial Estate is an allocated site within the Strategic Policies Land Allocations DPD that is an established existing industrial employment area. The site is made up of one large warehouse building, that internally is split into two buildings and one smaller storage building, with a large area of hardstanding to the west of the site and trees that are located to the south and east of the site. To the west of the site is the business of S J Bargh and to the east of the site is the business Holiday Inn.
1.2The site is located to the north of Caton Road. To the north of the site is a public right of way footpath (FP-15) and the River Lune, which are separated by a flood defence wall. To the south and west of the site are trees, some of which are protected (2006/386).
1.3There is an existing site access to the south of the site that connects to Caton Road. The existing access is traffic light controlled.
1.4The site is affected by flood risk and falls within both floodzones 2 and 3, as well as areas affected by surface water flooding and a 25-50% risk of ground water flooding.
2.0Proposal
2.1This is an application for full planning permission for the demolition of the detached outbuilding and part demolition of the existing warehouse building. The erection of a two storey office building with the refurbishment of the existing warehouse with cladding and solar panels to the roof. Other Page 1 of 10 CODE 23/00063/FUL associated works are proposed to the associated access, parking, service yard, refuse storage, landscaping, and drainage infrastructure.
2.2The detached outbuilding to the northwest of the site is to be demolished and an attenuation pond with landscaping is proposed. The proposed attenuation pond is approximately 56m in width and 32m in length and can hold 788m3 of water storage. The attenuation pond is the proposed surface water drainage infrastructure for the site with an underground pumping station to the east of the attenuation pond. The land surrounding the attenuation pond will be grassed with a number of trees planted.
2.3There are two parts of the existing warehouse building that are to be demolished. The far west of the warehouse will be demolished to accommodate a service yard with a large turning area suitable for HGV’s and an overflow car parking area. The proposed refuse storage will be sited to the west of the service yard. The far south of the existing warehouse building is to be partially demolished to accommodate the proposed two storey rear office extension. The proposed office extension will project from the southeast facing elevation by 15.3m, 34m in width and a height of 9.29m. The extension will be finished in a mixture of Graphite Grey cladding and glazing. The proposed office extension will be of a smaller footprint than of the partial warehouse that is to be demolished. The ground floor of the proposed office building will provide 9 offices, 2 meeting rooms, a reception, a lobby, a canteen and two sets of toilets, including showers. The first floor of the proposed office building will provide 7 offices, an IT room, two sets of toilets, a board room and a breakout space.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Car Park Nelson Street LancasterResolved : That the application be approved subject to the following conditions: 1. Development in accordance with Ap...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.