Resolved : That the application be approved subject to the following conditions: 1. Timescale; 2. Approved plans; 3. Decommissioning and removal in the event of the site becoming non-operational; 4. Construction Environmental Management Plan; 5. Construction Traffic Management Plan; 6. Surface water drainage strategy, Construction Surface Water Management Plan, Sustainable Drainage System Operation and Maintenance Manual and Verification Report of Constructed Sustainable Drainage System; 7. Biodiversity mitigation and enhancement plan; 8. District Level Licencing Confirmation; 9. Details of materials: colour and finish to containers; details of fencing; details of surfacing; details of building materials and finishes; 10. Details of external lighting; 11. Soft landscaping scheme; 12. Details and installation of access track and parking; 13. Development in accordance Preliminary Ecological Appraisal; 14. Verification Report of Constructed Sustainable Drainage System.
Word for word from the decision Lancaster published for this meeting.Source: committeeadmin.lancaster.gov.uk
Erection of 100MW energy storage facility including 50 energy storage battery units within steel shipping containers, and ancillary development including substation, transformers, transformer compound, underground cabling, inverters, switchgear, control/switch Proposal room, office/site store building, creation of hardstanding, erection of 3m security fencing, access gates, seven 3m CCTV masts and associated balancing pond, landscaping, access track and parking and the change of use of existing farm house and farm building to ancillary offices Hillside Farm Lancaster Road Application site Heaton With Oxcliffe Morecambe
Summary of Recommendation Approval, subject to conditions
(i) Procedural Matters
None.
1.0Application Site and Setting
1.1The application site is located 3.6km to the east of Heysham Power Station just to the south of the A683 (Bay Gateway). The site is made up of a former farm house (which is currently being lived in) and a series of redundant agricultural outbuildings (a total of 7). Approximately 1.2KM to the west is the Walney Offshore Windfarm Extension facility. Access to the site is taken from the A683 via the existing access to Hillside Farm.
1.2The site and wider area is set within a rolling drumlin landscape. The site is relatively level although there is a shallow fall to the south-east of the existing farmhouse. To the north west of the site lies some existing screening in the form of trees and hedgerows and then the A683 and to the east, south and west lie open agricultural fields. There are hedgerows that run through the western part of the site.
1.3The site is relatively unconstrained but does fall within the District’s Open Countryside and is within a Nature Improvement Area. The site does not lie within a protected landscape or a designated ecological designation although the site is located 600m to the west of the river Lune which is covered by the Morecambe Bay Ramsar, Special Protection Area, Special Area of Conservation and Site of Special Scientific Interest. The site lies within Flood Zone 1 and is identified as an Area Susceptible to Groundwater Flooding (>= 25% <50%). Page 1 of 9 CODE 22/01317/FUL 2.0 Proposal
2.1The application proposes the erection of an energy storage facility comprising 50 energy storage battery units within steel shipping containers, and ancillary development including substation, transformers, transformer compound, underground cabling, inverters, switchgear, control/switch room, office/site store building, creation of hardstanding, erection of 3m security fencing, access gates, seven 3m CCTV masts and associated balancing pond, landscaping, access track and parking.
2.2The submission also includes the change of use of two of the existing farm buildings of Hillside Farm for the proposed office and storage uses associated with the development of the above Energy Innovation Hub. The submission states that the remaining farm buildings will be redeveloped as a later phase of the project which does not form part of this application.
2.3The energy storage facility would have a capacity of 100MWh, which would be able to export at a rate of up to 50MW per hour, giving it the ability to supply power to the National Grid at this rate for up to two hours. The 50 energy storage battery containers would be installed as 25 paired units, along with ancillary equipment. The battery units would be housed in modular powder coated steel containers. The site would be surrounded by a steel security fence and perimeter landscaping.
3.0Site History
3.1A number of relevant applications relating to this site have previously been received by the Local Planning Authority. These include:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Car Park Nelson Street LancasterResolved : That the application be approved subject to the following conditions: 1. Development in accordance with Ap...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.