Resolved
RESOLVED : ( Unanimous ) That permission be granted subject to the following conditions: 1) Time 2) Approved Drawings 3) Hours of demolition and construction 4) Local Labour 5) No bonfires 6) External plant or equipment to be erected on or within the building to include noise impact survey 7) Samples of materials ( Notwithstanding the details shown on the plans hereby approved the roof tile shall be orange/red to match those that form the predominant character of the area) 8) Kitchen extraction location 9) Drainage strategy detailing foul and surface water to include SUDs 10) Lighting strategy 11) Details of retained and proposed areas of environmental merit (retained embankment) 12) Boundary treatments and landscaping 13) Submission of details of retaining walls to the bank adjacent to 50 East Dean Road and 2 Downside Close 14) Remediation strategy to deal with the risks associated with contamination of the site 15) Verification report relating to remediation strategy for contaminated land 16) Contamination found during development 17) No infiltration of surface water drainage into the ground is permitted 18) Piling or any other foundation designs using penetrative methods shall not be permitted 19) Traffic Management Scheme for demolition and construction 20) Prior to occupation, turning space for vehicles in-line with drawing 21) Prior to occupation, parking areas must be provided in accordance with approved plans 22) Cycle parking areas 23) Vehicle wheel washing equipment 24) Travel Plan Statement, prior to commencement of development (for operational staff) 25) Protection of existing trees (off site in Longland Road and street trees) 26) Protection of retained trees (on site) 27) Detailed plans of services in relation to trees 28) No contaminated material to be deposited at the site Informative: 1. Formal application for connection to public sewerage system 2. Formal agreement with Southern Water regarding infrastructure 3. Badger survey 4. Nesting birds