Resolved
RESOLVED (A) : ( By 6 votes with 1 abstention ) That permission be granted subject to a legal agreement covering highway and local employment related issues and subject to the following conditions: 1) Time 2) Drawings 3) Samples 4) Construction method statement 5) Hours of demolition and construction 6) Remove PD – Extensions and Outbuildings 7) Archaeology – Written Scheme of Investigation 8) Details of new access 9) Visibility splays to be cleared of all obstructions 10) Gradients of access 11) Details of surface water drainage 12) Construction Management Plan 13) Turning space 14) Parking areas 15) Cycle parking areas 16) Evidence of drainage (hydraulic calculations) to be submitted 17) Detailed drainage design to be submitted 18) Drainage layout and Southern Water agreement required 19) Detailed design to be informed by winter monitoring 20) Maintenance and management plan to be submitted 21) Prior to occupation evidence of correct construction to be submitted 21) No surface water infiltration 22) No piling or penetrative foundation design 23) Trees - Plan of services 24) Landscaping/planting scheme 25) Trees – excavations 26) Trees – Protection of existing trees 27) Trees - No bonfires 28) Refuse and recycling collection and storage 29) Details of external lighting 30) Protection of retaining wall to south east boundary 31) Details of boundary treatments 32) Protection of greensand walls 33) No contaminated materials on site Informative: 1) S106 for Highways 2) S106 for Local Labour Agreement 3) Southern Water 4) Highways – Licence 5) Highways – Construction of wall and AIP 6) Highways – Advisory note 7) Wildlife survey prior to development RESOLVED (B): ( By 6 votes with 1 abstention ) Should the S106 agreement not be signed within a reasonable time period (8 weeks from the date of the Committee resolution unless an extension of time has been agreed) the application should be refused on the grounds that there is no provision in place to ensure that the local labour initiatives and highway implications falling from the proposal can be delivered. This lack of key elements of infrastructure would be contrary to established development plan policies/procedures.