Resolved
Resolved : ( Unanimous ) That permission be granted subject to the following conditions: 1. The development hereby permitted shall be begun before the expiration of three years from the date of permission. 2. The development hereby permitted shall be carried out in accordance with the following approved drawings:- 278100 No. 10 Rev A; 278100 Drawing No. 22 Revision A; 278100 Drawing No. 23 Revision A; 278100 Drawing No. 25 Revision A; 278100 Drawing No. 26 Revision A; 278100 Drawing No. 27 Revision A. 3. All external materials shall be in accordance with the schedule of materials provided on approved drawings 278100 Drawing No. 26 Revision A and 278100 Drawing No. 27 Revision A. 4. Prior to the occupation of the development, details of hard and soft landscaping, to include defensible space for ground floor amenity areas, details of a covered and secure bin store and details of all balcony screening, shall be submitted to and approved by the Local Planning Authority. 5. Prior to the commencement of development, details of the proposed means of foul sewerage and surface water disposal shall be submitted to, and approved in writing, by the Local Planning Authority, in consultation with Southern Water. 6. Prior to the occupation of the development, the following matters relating to sustainable urban drainage shall be addressed:- a. Detailed design of the permeable pavement which is proposed by the FRA shall be provided and, thereafter, implemented. If connection directly to the public sewer is proposed, surface water runoff should be limited to a rate agreed to by Southern Water for all rainfall events including those with a 1 in 100 (plus 40%) annual probability of occurrence. Hydraulic calculations should be submitted in support of the surface water drainage strategy together with evidence that Southern Water agrees to the proposed surface water discharge rate and connection. b. If it is proposed to re-use existing connections, the condition of the existing surface water drain shall be investigated before discharge of surface water runoff from the development is made. Any required improvements to the condition of the surface water sewer shall be carried out prior to construction of the outfalls. c. A maintenance and management plan for the entire drainage system shall be submitted to the planning. This plan shall clearly state who will be responsible for managing all aspects of the surface water drainage system, including piped drains, and the appropriate authority should be satisfied with the submitted details. Evidence that these responsibility arrangements will remain in place throughout the lifetime of the development shall be provided to the Local Planning Authority. d. Evidence (including photographs) shall be submitted showing that the drainage system has been constructed as per the final agreed detailed drainage designs 7. The development permitted by this planning permission shall only be ... view the full minutes text for item 49.