to refer the interim report arising from Dame Judith Hackett’s Independent Review of Building Regulations and Fire Safety to Mayor and Cabinet and ask that any changes necessary to ensure that Lewisham residents’ concerns about fire safety are addressed in an adequate and clear way, are made to the Council’s current building control systems.
Word for word from the decision Lewisham published for this meeting.Source: councilmeetings.lewisham.gov.uk
2.1It is recommended that the Overview and Scrutiny Committee note the report.
3. Council responsibilities as part of building control
3.1It is the responsibility of the developer, in conjunction with their chosen Building Control Body (local authority or Approved Inspector), to demonstrate that the building regulations have been satisfied.
3.2Regulations cover a wide variety of items within the building such as the structural and fire safety, energy efficiency, drainage, accessibility, ventilation, amongst other things.
3.3Due to the highly complex nature of developments, there is no standardised ‘checklist’ of building control activities. However, Officers have set out below the stages, and procedure, the Council’s Building Control service follow when providing Building Regulations approval on a development/building.
3.5Plans are submitted to the Building Control Body detailing, amongst other things, foundations and drainage proposals, materials for external and internal finishes, elevations, cross-sections. A Building Control Surveyor will check the plans thoroughly, liaising with the developer/contractor until they are satisfied the plans propose a compliant development. Surveyors ensure that the plans meet all relevant technical requirements of the regulations. The plans are then passed or passed subject to certain conditions. 3.6 Officers will undertake site visits at various stages through development. Inspections are based on risk assessments. Normally, there would be intensive inspections in early and final stages. In the early stages, foundations and drainage below ground would be targeted. Essentially the inspections would focus on critical elements that would be covered up during construction. In the final stages, the focus would be on items such as fire safety, above ground drainage, etc. These inspections are limited in that surveyors are not always able to inspect every aspect of a building’s construction. Periodic inspections would pick up issues of non-compliance which are then addressed through the construction process, rather than at the end. The developer is responsible for demonstrating compliance with the regulations. Building Control Body is there to verify compliance as far as it is practicable.
3.7Following practical completion of the development the Council will usually approve the development. In the case of new build, there are a number of certificates that are required from an accredited testing body before the work is finally signed off. These certificates relate to items such as gas and electrical safety, energy efficiency, acoustic performance, etc. Once a Completion Certificate is issued the Building Control involvement ends, unless or until further changes are made to the building which require approval under Building Regulations.
3.8Approvals under Building Regulations can be issued by the local authority or an Approved Inspector (private sector ‘for profit’ providers of Building Control that operate in direct competition with local authority Building Control teams). When a developer chooses to work with an Approved Inspector, local authorities do not have any powers to intervene or enforce the regulations unless the projects is returned to the local authority by the Approved Inspector.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Draft Annual Complaints Reports 2025/26That • the report and appendices be noted; and • the following lines of inquiry be taken forward to support learning ...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.