Item8
Resolved
RESOLVED that planning permission be granted subject to the following conditions and informatives: CONDITIONS: 1.STANDARD TIME CONDITION The development to which this permission relates must be begun not later than the expiration of three years beginning with the date on which the permission is granted. Reason: As required by Section 91 of the Town and Country Planning Act 1990. 2. DEVELOPMENT IN ACCORDANCE WITH APPROVED PLANS The development shall be carried out strictly in accordance with the application plans, drawings and documents hereby approved and as detailed below: P2-05; P2-06; P3-01 Rev.A; PA-02; A2-01 Rev.A; A4-01 Rev.C; A4-02 Rev.A; A4-03 Rev.A; A6-03; NOV-XX-XX-DR-M-5701; 615/SE26/20/1_SLP01 Reason: To ensure that the development is carried out in accordance with the approved documents, plans and drawings submitted with the application and is acceptable to the local planning authority. 3. BUILDING FABRIC SOUND INSULATION (a) The building shall be designed so as to provide sound insulation against external noise and vibration, to achieve levels not exceeding 30dB LAeq (night) and 45dB LAmax (measured with F time weighting) for bedrooms, 35dB LAeq (day) for other habitable rooms, with window shut and other means of ventilation provided. External amenity areas shall be designed to achieve levels not exceeding 55 dB LAeq (day) and the evaluation of human exposure to vibration within the building shall not exceed the Vibration dose values criteria ‘Low probability of adverse comment’ as defined BS6472. (b) Following implementation of the sound insulation scheme pursuant to part (a), a compliance report, prepared by a suitably qualified sound engineer, must be submitted to and approved in writing by the Local Planning Authority. (c) The development shall not be occupied until the sound insulation scheme and all recommendations outlined in the submitted Noise and Vibration Assessment (Hepworth Acoustics dated November 2019), and any subsequent recommendations arising from the compliance report pursuant to part (b) have been implemented in full. Thereafter, the sound insulation scheme shall be maintained in perpetuity in accordance with the approved details. Reason: To safeguard the amenities of the occupiers of the proposed dwellings and to comply with DM Policy 26 Noise and vibration, DM Policy 31 Alterations and extensions to existing buildings including residential extensions, DM Policy 32 Housing design, layout and space standards, and DM Policy 33 Development on infill sites, backland sites, back gardens and amenity areas of the Development Management Local Plan (November 2014). 4.SOUNDPROOFING BETWEEN RESIDENTIAL AND COMMERCIAL (a) The development shall be designed to incorporate soundproofing of a specification for sound insulation against airborne noise to meet D’nT,w + Ctr dB of not less than 55 for walls and/or ceilings where residential parties non domestic. (b) Following implementation of the soundproofing pursuant to part (a), a compliance report, prepared by a suitably qualified sound engineer, must be submitted to and approved in writing by the Local Planning Authority. (c) The development shall not be occupied until the soundproofing and all recommendations outlined in the submitted Noise and Vibration Assessment (Hepworth Acoustics dated November 2019), and any subsequent ...
Word for word from the decision Lewisham published for this meeting.
Source: councilmeetings.lewisham.gov.uk