Resolved that – (i) the information provided be noted; (ii) the installation of Haldopillar Meter Cabinets with a consumption meter to supply traders who require fixed permanent power supplies, be approved (iii) the annual availability charge to Scottish Power for the provision of power to the Unit and the cost of the electricity used be met by the trader, be approved. (iv) with effect from 1 April 2005, the following condition be attached to all street trading licences – “Generators with an output of 3.3KW and above are not permitted. Where possible, a metered power supply will be made available. Traders using metered power supplies are responsible for the payment of any electricity used in connection with their street trading business and the availability charge levied by Scottish Power.”
Word for word from the decision Liverpool published for this meeting.Source: councillors.liverpool.gov.uk
Report to Street Trading Committee 2016/17, 6 pages
2O2O LIVERPOOL
ELECTRICAL ENGINEERING SERVICES FEASABILITY STUDY FOR THE STREET TRADER POWER SUPPLIES
2O2O LIVERPOOL West House Mercury Court Tithebarn Street Liverpool L2 2QP July 2004 ELECTRICAL ENGINEERING SERVICES FEASABILITY STUDY TABLE OF CONTENTS
PAGE NO.
1.0GENERAL REQUIREMENTS 3
2.0CURRENT POWER USE 3
3.0PROPOSED SCHEME 4
4.0COSTS 5
5.0DRAWINGS 6
2 1. GENERAL REQUIREMENTS
1.1Due to the proposed relocation of the Street Traders in Liverpool City Centre, Liverpool City Council have asked 2020 Liverpool to undertake a feasibility study of the proposed new locations for the Street Traders, in relation to providing fixed permanent power supplies. This Report is intended to outline the scope of the electrical services installation work that will be required, and to describe the performance of the proposed scheme only, from which the full design, specification and installation details are to be prepared.
1.2The study has been carried out based on the information received from [name removed] on 05.07.04 and in liaison with Core Utilities. This feasibility study has been based on the Street Traders power needs as at July 04, and 2020 Liverpool is not responsible for any subsequent change in requirement at a future date from the Traders.
1.3A full site walk around was carried out on 05.07.04 with [name removed] and proposed locations were agreed.
2. CURRENT POWER USE
At the time of the site walk it appeared that only the food outlets and ice cream vans had a requirement for power.
This can be broken down in more detail:
Stall Number 40 Current Location – Parker Street NB This trader has been temporarily relocated outside Tesco Metro Trade – Ice Cream
This trader currently uses a 7KW generator. I have established with the trader that provision of a 16amp Commando Socket Outlet supply will fulfil his business requirement.
Stall Number 14 Current Location – Church Street Trade – Ice Cream
This trader currently uses a 3.3KW generator. I was unable to establish with the trader his power requirement. Therefore, based on his current use a 16amp Commando Socket Outlet supply will fulfil his business requirement.
Stall Number 19 Current Location – Church Street Trade – Ice Cream
This trader currently uses a 3.3KW generator. I was unable to establish with the trader his power requirement. Therefore, based on his current use a 16amp Commando Socket Outlet supply will fulfil his business requirement.
Stall Number 24 Current location – Paradise Street Trade - Ice Cream
This trader currently uses a 3.3KW generator. I was unable to establish with the trader his power requirement. Therefore, based on his current use a 16amp
3 Commando Socket Outlet supply will fulfil his business requirement.
3. PROPOSED SCHEME
The study has looked at generators of 3.3KW and above and due to the power requirement for each stall exceeding 500Watts and the number of proposed points greater than 4, the power provision MUST be installed by the Regional Electricity Company, which is Scottish Power/Manweb. In this case Core Utilities Solutions which is a subsidiary of SP will undertake the works.
The site visit identified only 4 street traders that are using power generated by of petrol generators. It is the intention of LCC to provide the street traders the option of a fixed 2KW metered power supply when they relocate to a new position which is, as yet, unknown. With this is mind Core Utilities were asked to provide costs for the following requirement:
At each proposed location a 2KW metered supply, housed in a meter cabinet fitted with a consumption meter will be located conveniently against a wall to avoid obstruction.
The proposed locations are as follows: ( See Drawing: FINAL )
Williamson Street Williamson Square ( see note ) Roe Street ( x 2 ) Church Alley Basnett Street Parker Street Cases Street Elliot Street* Ranelagh Street/Waterloo Place Houghton Street Sweeting Street** Cases Street**** Fenwick Street*** Tarleton Street
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.