Traffic Regulation Order for Edge Lane Phase 1&2 TM (between Botanic Place and Rathbone Road) - Anfield, Tuebrook and Stoneycroft and Old Swan Neighbourhood Committee - 24 August 2006
AgreedExecutive1 paper
Executive Board agreed this item on Friday 22 September 2006. Below is the council's own wording, with the papers it was decided on.
Agreed that ;- The report be supported subject to the following reservations;- Members requested that provision for cyclists should be fully integrated in all major road strategies in the City ; Cycling should be encouraged and the safety of cyclists be ensured; and The matter be referred to the Executive Board with a view to future schemes taking into account issues raised.” _____ Councillor Paul Clein raised an issue in respect of Edge Lane. _____ Resolved that the matter be referred to the Interim Executive Director (Regeneration) for a report.
Word for word from the decision Liverpool published for this meeting.Source: councillors.liverpool.gov.uk
Everton, Kensington, Fairfield and Picton Neighbourhood Committee Date: 24th July 2006 & Anfield, Tuebrook, Stoneycroft and Old Swan Neighbourhood Committee Date: 24th August 2006 TRAFFIC REGULATION ORDER PHASE 1 and 2 TM – 2603 DELEGATED POWERS REFERENCE PHASE 1 and 2 – TT/12/06
Kensington /Fairfield / Picton and Old Swan Wards
Proposed Traffic Regulation Orders for Edge Lane Phase 1 & 2 (Between Botanic Place and Rathbone Road).
The purpose of this report is to provide additional information to Members of the Neighbourhood Committee following comments made in relation to the above proposals at its meeting on 20 March 06, and to advise Members of the proposed closures contained within Phase 2 of the Edge Lane Project.
For ease of reference, continuity and programming the report is split into two parts. Part 1 deals with the comments made at the Neighbourhood Committee meeting on 20 March 06, with Part 2 providing information in support of the new proposals contained in Phase 2.
INFORMATION
1.0Background (Part 1)
1.1Members of the Neighbourhood Committee will be aware that a report was tabled at the Neighbourhood Committee on 20 March 2006, detailing proposals to close gaps in the central reservation of Edge Lane at various locations. This report detailed the various elements to the scheme and the improvements to the local area which have been summarised below. The proposed TRO’s are considered an integral part of promoting the aspirations of the City Council to “…develop a boulevard concept which improves the sense of arrival into Liverpool City and enhances the image of Edge Lane as a place to invest in, work in and live in”;
1.2The proposals for Edge Lane have been broken down into four manageable phases which have been referred to as;
• EL Phase 1 (between Botanic Place and South Bank Road).
• EL Phase 2 (between South Bank Road and St Oswald’s / Rathbone Road).
• Edge Lane Drive (between Broad Green Road and St Oswald’s / Rathbone Road ) and;
• Edge Lane West (Between Botanic Place and Hall Lane).
1.3To facilitate the enhancement of Edge Lane and the surrounding area a number of key improvements to the area are proposed including:-
• Enhancing the existing highway environment through the introduction of new road surfacing and footway construction. These footways will be constructed of robust materials such as granite kerbing and new paving.
• The introduction of a new unbroken central reservation from St Oswald’s Street through to Hall Lane to improve driver predictability and prevent vehicles queuing in the outside lane thereby reducing capacity of the corridor.
• The improvement and introduction of various new signalised junctions to manage traffic more effectively. These signalised junctions will also include improved pedestrian facilities at all locations. • Provide consistency of route creating an urban boulevard from the M62 to the city centre by the use of new tree planting and open urban spaces.
1.4Following the presentation of the initial report, Members requested that an additional report was shared with the next available Neighbourhood Committee to detail in more depth why the closure of the gaps in the central reservation would be required.
1.5The purpose of the first part of this report is to provide a detailed analysis of why these gaps need to be closed and what the response rates and general comments were during the initial consultation.
2.0Proposals
Primarily the gaps in the central reservation along Edge Lane are recommended for closure to create the boulevard concept and to avoid driver delay along the route when encountering right / U turning traffic.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Traffic Regulation Order for Edge Lane Phase 1&2 TM (between Botanic Place and Rathbone Road): Anfield, Tuebrook and Stoneycroft and Old Swan Neighbourhood Committee: 24 August 2006Report
78Traffic Regulation Order for Edge Lane Phase 1&2 TM (between Botanic Place and Rathbone Road) - Anfield, Tuebrook and Stoneycroft and Old Swan Neighbourhood Committee - 24 August 2006This decision
Traffic Regulation Order for Edge Lane Phase 1&2 TM (between Botanic Place and Rathbone Road) - Anfield, Tuebrook and Stoneycroft and Old Swan Neighbourhood Committee - 24 August 2006This decision
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.