Resolved (6 members voting in favour and 1 against) that (i) whilst endorsing the Draft Masterplan the Board agrees that the following should be included in the response – · views of the local residents following a recently undertaken survey; · the Eastern Access Transport Corridor being also considered for a rail link; and · the Western Link through Liverpool South Park; and (ii) in view of the timescale for the submission of comments by 12 October authority be granted for the Leader of the Council and the Executive Member (Regeneration and Transport) to approve the final response taking into account the views of the Board as set out above. NH/20
Word for word from the decision Liverpool published for this meeting.Source: councillors.liverpool.gov.uk
Liverpool John Lennon Airport (LJLA) has seen significant growth and currently caters for some 4.5 million passengers per year (mppa). In 2003 the Government issued a White Paper “Future of Air Transport” which looked at the future growth of airports across the UK, and in relation to LJLA endorsed growth of up to some 12 mppa by 2030. The White Paper also recognised that there may be a case for extending the current runway to around 2,700 metres and considered this acceptable provided there was no encroachment on the River Mersey Site of Special Scientific Interest, Ramsar site and Special Protection Area.
The White Paper also requires major airports to prepare Master Plans to guide their future development, LJLA have issued their Draft Airport Masterplan for consultation and the purpose of the report is to advise the Council of the contents of the document and to recommend a respond to this. In parallel, a Merseyside response has been prepared by the Merseyside Policy Unit and is separately being agreed.
Annex 1 to this document is a summary of the Draft Master Plan, together with plans illustrating the existing Site Location (Plan 1); the Draft Master Plan to 2015 (Plan 2) and the Draft Master Plan to 2030 (Plan 3).
In broad terms the Draft Master Plan is based on passenger transport forecast of 8.3 million by 2015 and 12.3 million by 2030. In terms of air traffic movement (ATMs) this represents an increase from 93,600 in 2005; to 162,700 by 2015; and 231,100 by 2030.
Based on these assumptions the Master Plan outlines the likely physical expansion of the Airport, to 2015, and to 2030.
The Draft Master Plan to 2015 shows growth of the airport largely within its existing boundary with some take up of Green Belt Land within Halton being used for a runway extension. Up to 2015 the only developments shown to the south of the airport boundary are a new fire station and engine test bay; and to the north-west, new airport infrastructure, a proposal to redevelop the former Dunlop site and part of the International Business Park for employment purposes.
The Draft Master Plan to 2030 shows passenger facilities still concentrated to the north of the existing runway with development south of the runway in current Green Belt at Oglet, for cargo and maintenance developments; and as a proposed employment development area. The remaining Oglet area is shown as an enhanced Coastal Park, extending the coastal park currently being developed along the coastal edge of the former Northern Airfield.
Whilst in terms of access strategy the Draft Master Plan sets targets for increasing public transport use, the Draft Master Plan shows the intention of constructing an Eastern Access Transport Corridor to the east of the airport, linking up at either of two points to the A561; near Higher Road or the A5300 Knowsley Expressway. The Draft Masterplan assumes that the Eastern Access Road would be constructed before 2015 but does not specify when it would be required or how it would be funded.
LJLA currently falls entirely within the City Council boundary, and the City Council is the local planning authority. However elements of the future expansion of the airport extend into Halton (the proposed runway extension and eastern access road and Knowsley (the junction of the eastern access with the A561). It is the Airport’s intention to submit a planning application for its 2015 expansion proposals towards the end of this year/early next year.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.