Resolved that the recommendation of the Planning Manager to refuse the application be approved for the reasons set out, however the local planning authority would indicate its support (subject to proper consideration and consultation) for a further application that seeks permission for the revised route of the canal link through the already filled Trafalgar Dock as now proposed, but which does not seek permission for the infilling of the West Waterloo Dock.
Word for word from the decision Liverpool published for this meeting.Source: councillors.liverpool.gov.uk
Report to Planning Committee 2010/21 old, 20 pages
- Item 4
Ward: Kirkdale Site: Trafalgar Dock and West Waterloo Dock, Waterloo Road, Liverpool, L3
Proposal: To carry out engineering works so as to narrow and re- align the Liverpool Canal Link through Trafalgar and West Waterloo Docks; to bridge the canal link at Trafalgar Dock and to backfill the remainder of West Waterloo Dock to 0.5 metres below quayside level, using suitable material arising from the construction of the canal channel (Resubmission of application 06F/1421 - withdrawn)
Applicant: British Waterways
Application No: 06F/2292 Date Valid: 31st July 2006
The 6.35 hectare application site falls within the Central Docks area which is approximately 1 km north of the Pier Head. The area includes the former Trafalgar Dock, which has been previously infilled and the West Waterloo Dock which has been infilled at its northern end to ground level, and partially infilled, but retaining open water at its southern end.
The site forms part of the sequence of docks stretching north of the Pier Head. Immediately to the east of the application site and overlooking West Waterloo Dock is Waterloo Quay, a modern development of flats. Beyond Waterloo Quay is the open water of East Waterloo Dock and then the listed Waterloo Warehouse which has also been converted to flats. To the west is a vacant dock quayside, the infilled Waterloo River Entrance and the River Mersey. Immediately south and connected to West Waterloo Dock is the Princes Half Tide Dock which is currently being partially filled and to the north is Salisbury Dock and the rest of the Central Docks complex.
Planning Committee 10 October 2006 -1- Item 4 Cont The application site is within a Mixed Use Area in the UDP.
The dock areas of Trafalgar and West Waterloo Dock fall outside the boundaries of the Stanley Dock Conservation Area and the World Heritage Site but the southern quayside of West Waterloo Dock and the land between West Waterloo Dock and Princes Half Tide Dock is within these designations. The whole of the application site falls within the World Heritage Site Buffer Zone. The adjacent Princes Half Tide Dock is a Grade II listed structure. The listing includes the southern walls of West Waterloo Dock which form the entrance to Princes Half Tide Dock.
Access to the site is from Waterloo Road but is currently secured in connection with the temporary use of land at Trafalgar Dock as a material recycling facility for the Paradise Street development.
The Proposal
Planning permission is sought to re-align the proposed route of the Liverpool Canal Link granted planning permission by application 04F/0823, as it passes through Trafalgar and West Waterloo Docks. Under the current approved alignment, the canal link is to pass in a 10 metre wide channel along the eastern side of Trafalgar Dock, veering towards the centre of Trafalgar Dock to pass through the original link between Trafalgar and West Waterloo Docks and then continue towards the centre of West Waterloo Dock into the open water.
The new alignment would still use the eastern dock wall of Trafalgar Dock but reduce the width of the channel from 10m to 6.5m. A new bridge would be constructed at the connection between Trafalgar and West Waterloo Dock and the canal link extended along the eastern wall of West Waterloo Dock, widening out at the southern end to use the existing entrance to Princes Half Tide Dock. The remainder of West Waterloo Dock would be infilled using material excavated from digging the channel to the north through Trafalgar Dock and with material arising from the construction of the canal link at Pier Head. The new ground level of West Waterloo Dock would be 0.5 metres below the quayside level in line with the existing fill in Trafalgar Dock.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies