CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Liverpool City Council

Called in Item - Liverpool John Lennon Airport Masterplan (R&T/29)

Agreed Committee 7 papers

Regeneration and Economic Development Select Cttee 2006/07 agreed this item on Thursday 2 November 2006. Below is the council's own wording, with the papers it was decided on.

Item30

Resolved

Resolved (6 members voting in favour and 1 against) that (i) whilst endorsing the Draft Masterplan the Board agrees that the following should be included in the response – · views of the local residents following a recently undertaken survey; · the Eastern Access Transport Corridor being also considered for a rail link; and · the Western Link through Liverpool South Park; and (ii) in view of the timescale for the submission of comments by 12 October authority be granted for the Leader of the Council and the Executive Member (Regeneration and Transport) to approve the final response taking into account the views of the Board as set out above.” ____ With the permission of the Committee Councillors Paula Keaveney and Richard Oglethorpe advised the Committee why the item had been called in. They expressed particular concern about - The possibility of the new jobs created not being filled by local people; The non delivery of the consultation material to some local residents; Local ward Councillors not being consulted prior to the decision being made; the lack of a commitment from Peel Holdings to reviewing the criteria for sound insulation grants; the proposed routes to the airport the increased noise and pollution levels; and Peel ... view the full minutes text for item 30.
Word for word from the decision Liverpool published for this meeting. Source: councillors.liverpool.gov.uk

Follow this further

Built from Liverpool's papers

What the report saysPro

Report to Regeneration and Economic Development Select Cttee 2006/07, 4 pages

Executive summary

Liverpool John Lennon Airport (LJLA) has seen significant growth and currently caters for some 4.5 million passengers per year (mppa). In 2003 the Government issued a White Paper “Future of Air Transport” which looked at the future growth of airports across the UK, and in relation to LJLA endorsed growth of up to some 12 mppa by 2030. The White Paper also recognised that there may be a case for extending the current runway to around 2,700 metres and considered this acceptable provided there was no encroachment on the River Mersey Site of Special Scientific Interest, Ramsar site and Special Protection Area.

The White Paper also requires major airports to prepare Master Plans to guide their future development, LJLA have issued their Draft Airport Masterplan for consultation and the purpose of the report is to advise the Council of the contents of the document and to recommend a respond to this. In parallel, a Merseyside response has been prepared by the Merseyside Policy Unit and is separately being agreed.

Annex 1 to this document is a summary of the Draft Master Plan, together with plans illustrating the existing Site Location (Plan 1); the Draft Master Plan to 2015 (Plan 2) and the Draft Master Plan to 2030 (Plan 3).

In broad terms the Draft Master Plan is based on passenger transport forecast of 8.3 million by 2015 and 12.3 million by 2030. In terms of air traffic movement (ATMs) this represents an increase from 93,600 in 2005; to 162,700 by 2015; and 231,100 by 2030.

Based on these assumptions the Master Plan outlines the likely physical expansion of the Airport, to 2015, and to 2030.

The Draft Master Plan to 2015 shows growth of the airport largely within its existing boundary with some take up of Green Belt Land within Halton being used for a runway extension. Up to 2015 the only developments shown to the south of the airport boundary are a new fire station and engine test bay; and to the north-west, new airport infrastructure, a proposal to redevelop the former Dunlop site and part of the International Business Park for employment purposes.

The Draft Master Plan to 2030 shows passenger facilities still concentrated to the north of the existing runway with development south of the runway in current Green Belt at Oglet, for cargo and maintenance developments; and as a proposed employment development area. The remaining Oglet area is shown as an enhanced Coastal Park, extending the coastal park currently being developed along the coastal edge of the former Northern Airfield.

Whilst in terms of access strategy the Draft Master Plan sets targets for increasing public transport use, the Draft Master Plan shows the intention of constructing an Eastern Access Transport Corridor to the east of the airport, linking up at either of two points to the A561; near Higher Road or the A5300 Knowsley Expressway. The Draft Masterplan assumes that the Eastern Access Road would be constructed before 2015 but does not specify when it would be required or how it would be funded.

LJLA currently falls entirely within the City Council boundary, and the City Council is the local planning authority. However elements of the future expansion of the airport extend into Halton (the proposed runway extension and eastern access road and Knowsley (the junction of the eastern access with the A561). It is the Airport’s intention to submit a planning application for its 2015 expansion proposals towards the end of this year/early next year.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Called in Item: Liverpool John Lennon Airport Masterplan (R&T/29)Report 4 pages DownloadRead as text
PDF
Letter from Peel AirportsReport 7 pages Download
PDF
R&T.29 LJL Airport Masterplan Annex 1Appendix 6 pages Download
PDF
R&T.29 LJL Airport Masterplan Annex 2Appendix 7 pages Download
PDF
R&T.29 LJL Airport Masterplan Plan 1Report 1 pages Download
PDF
R&T.29 LJL Airport Masterplan Plan 2Report 1 pages Download
PDF
R&T.29 LJL Airport Masterplan Plan 3Report 1 pages Download

At this meeting

Whole meeting

Who was there

16 of 22 attended
KA
Councillor Karen AffordAssistant Member, present
RB
Councillor Rose BaileyMember, present
PB
Councillor Paul BrantMember, apologies
EC
Councillor Eddie CleinChair, present
FC
Councillor Flo Clucas OBEExecutive Member, present
KF
Councillor Kevin FirthMember, present
SH
Steven HolcroftOfficer, expected
SH
Councillor Steve HurstAlternate, present
IJ
Councillor Ian JoblingMember, present
JL
Joan LeonardSecretary, expected
BM
Councillor Barbara MaceAssistant Member, present
PM
Councillor Peter MilleaExecutive Member, present

All 22 on the meeting page

On this subject at Liverpool

Search all
  1. Called in Item - Liverpool John Lennon Airport Masterplan (R&T/29)This decision
  2. Called -in Decision - South Liverpool Site - Option Agreement (DML/29)Noted
  3. Called In Item: Liverpool attendance at Shanghai Expo 2010 (L/4)Agreed
  4. Called In Item: Design of Pedestrian Crossings in Liverpool (A&D/27)Agreed
  5. Called in Item -Liverpool Waterfront Mann Island Planning Development BriefApproved
  6. Called In Item - Liverpool Architectural Design TrustAgreed

More from Liverpool Regeneration and Economic Development Select Cttee 2006/07

All decisions
MeetingDecisionOutcome
29 Mar 2007 Local Employment and Construction Industry Scrutiny Panel - Final ReportAgreed that - a) the recommendations contained in the report be approved so far as this Committee is concerned and re... Agreed Open
29 Mar 2007 Regeneration General Fund Financial Review Quarter 3 2006/07Agreed that the information contained within the report be approved so far as this Committee is concerned. Agreed Open
29 Mar 2007 Regeneration Transport Capital Programme 2007/08 (R&T/64)Agreed that - (a) a copy of a map showing the locations of the roads to be resurfaced be provided to all Members of t... Agreed Open
29 Mar 2007 Review of Higher Education Funding - Impact on the Ecomonic Development of the CityAgreed that - (a) the terms of the motion be approved and a scrutiny panel be established in the new municipal year t... Agreed Open
29 Mar 2007 Key Performance IndicatorsAgreed that the information be noted and the Committee is pleased to note the improving trend with regard to BV 165 –... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies