Resolved
Agreed that the minutes of the meeting held on 12 April, 2007 be approved as a true record. Matters arising Minute No. 74 Camelot Street Paving Replacement Elaine Stewart advised the Committee that a walkabout of the area had been carried out and she was awaiting feedback from this. Councillor Alan Dean stated that the situation looks better than a while ago, but the tarmac is raking up and water is seeping in. He also stated that litter is sticking to the tarmac and is very difficult to remove. He asked if there was some kind of seal that can be applied to the tarmac to stop this. Liverpool Enterprise informed the Committee that quality issues have been picked up following the walkabout. Treatment to surfaces is not usually considered until a period of time has passed, by nature tarmac has open pores and is designed like this so it does not degrade. He stated the issue regarding cleaning the tarmac will be looked into and brought back to a future meeting. Belgrave Public House, Bryanston Road This Neighbourhood Committee opposed this application on the grounds of residential amenity. The application is still ongoing although it would appear that it may be going before the Planning Committee in mid July. Pedestrian Safety on Aigburth Road It was agreed at the Executive Board meeting on 16 March 2007 that a report be submitted back to the Board when the issues raised in the Motion have been investigated. As part of the investigation into the request for a controlled pedestrian crossing on Aigburth Road in the vicinity of Fulwood Drive, a traffic survey was carried out on 27 June 2007. This survey involved a vehicle and pedestrian count over a 12 hour period (7am-7pm) and is to determine whether the pedestrian demand is high enough for a controlled pedestrian crossing to be considered at this location. The results of the traffic survey together with an analysis of the other issues raised in the Motion will be covered in a report to the Executive Board in July 2007. This year a Works Order has been issued for uncontrolled crossings at both sides of Aigburth Road stretching from it’s junction with Galbraith Close to it’s junction with Thirlsthane Street. Works have also been issued for uncontrolled crossings from Fulwood Drive/Kings Close to Aigburth Road/ Fulwood Drive. These works will start mid July, 2007 and should take approximately two months to complete. Issues from Advisory Members Condition of Pavements on Upper Stanhope Street The treatment of footways and treatment selection are determined annually following surveys undertaken with a fully accredited United Kingdom Pavement Management System (UKPMS). This system forms the basis of Best Value Performance Indicators for footway condition and is utilized by all Local Authorities in England in order to identify footways (or parts of footways) that require maintenance or improvement based on their condition and relative deterioration. In respect to Upper Stanhope St the aforementioned pavement management system based on most ... view the full minutes text for item 5.