Resolved that the recommendation be approved and that in addition the installation of CCTV facilities at the site location to assist monitoring of compliance with vehicle routing requirements be included within the traffic management plan, at the expense of the applicant, and that Councillor Ashton representing Knowsley Metropolitan Borough Council be consulted in respect of the content of the plan, prior to agreement by the Local Planning Authority.
Word for word from the decision Liverpool published for this meeting.Source: councillors.liverpool.gov.uk
Report to Planning Committee 2010/21 old, 17 pages
Item 4
Ward: Fazakerley
Site: Gillmoss Recycling Park, Stonebridge Lane, Liverpool, L10 To erect an 18-metre high building (maximum height) comprising a material recovery facility and offices, with Proposal: associated car parking, landscaping, fencing, and access; to form a landscaped bund to rear of properties at 28-62 Longdown Road, and carry out associated works
Applicant: Merseyside Waste Disposal Authority
Application No.: 08F/3196 Date Valid: 22/12/2008 City North D.C. Team:
Recommendation: Approve with Conditions
Case Officer Report
Site Description
The application site comprises a vacant area of land off the eastern side of Stonebridge Lane, Liverpool 10 which forms part of the existing Merseyside Waste Disposal Authority (MWDA) Gillmoss Waste Transfer Station (WTS). The site lies immediately to the south of the existing access to the WTS and adjacent to Stonebridge Lane and would utilise the existing site access. The WTS site is bounded by residential development to the northern boundary although the nearest residential property would be situated approximately 150m from the proposed Materials Recovery Facility (MRF). The site is bounded to the east and south by existing industrial sites and the Fazakerley Waste Water Treatment works are located on the opposite side of Stonebridge Lane.
The site is zoned as a Primarily Industrial Area under Policy E1 of the UDP. However the site is established as a Waste Reception Centre and Policies EP5 and EP6 are therefore relevant to this application.
The Proposal
The proposed material recovery facility comprises;
(i) An MRF building, orientated with the long axis in an east to west direction. The dimension would be width 80m, length 90m and height 16.86m to the ridge. The building would have a truss rafter construction with cladding and architectural enhancement to all sides. (ii) A self contained visitor and education centre integrated within the footprint of the MRF building at the north east corner.
The site would be contained within the wider WTS site and would benefit from the existing landscaping, screening and boundary treatments. However it is proposed to provide an additional mitigation measures in the form of a screening bund to the north of the wider site adjacent to the residential dwellings.
The facility would be designed to process recyclable materials 24hrs per day, although the facility would have to be maintained on a regular basis with routine daily maintenance taking place each night. The facility would operate a three shift system with all manual hand picking staff and maintenance staff working the following hours: 6:00 – 14:00, 14:00 – 22:00 and 22:00 – 06:00. In total there would be 60 people working in sorting the recyclates on any one day. The visitor and education centre would operate between 9:00 – 17:00 daily.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.